Chapter Two

David L. Weissman
{"title":"Chapter Two","authors":"David L. Weissman","doi":"10.23943/9781400889693-016","DOIUrl":null,"url":null,"abstract":"A AASHTO Publications ..............................................................................................................1-1 Above Ground Spillways (Concrete Flume Types I & II) ......................................................... 2-41 Abrasion (Culverts) ................................................................................................................ 1-56 Acidic Soils ............................................................................................................................ 1-56 Additional Pay Lengths (Culverts) .......................................................................................... 1-39 Connecting Bands ............................................................................................................ 1-39 Elbows ............................................................................................................................. 1-39 Anchorage (Culvert) ............................................................................................................... 1-55 Articulated Concrete Block Ditch Lining ................................................................................. 2-48 As-Built Plans ..........................................................................................................................1-6","PeriodicalId":208745,"journal":{"name":"Eugene Onegin","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1968-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eugene Onegin","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23943/9781400889693-016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A AASHTO Publications ..............................................................................................................1-1 Above Ground Spillways (Concrete Flume Types I & II) ......................................................... 2-41 Abrasion (Culverts) ................................................................................................................ 1-56 Acidic Soils ............................................................................................................................ 1-56 Additional Pay Lengths (Culverts) .......................................................................................... 1-39 Connecting Bands ............................................................................................................ 1-39 Elbows ............................................................................................................................. 1-39 Anchorage (Culvert) ............................................................................................................... 1-55 Articulated Concrete Block Ditch Lining ................................................................................. 2-48 As-Built Plans ..........................................................................................................................1-6
第二章
A AASHTO台出版物 ..............................................................................................................1-1表演Ground Spillways (Concrete Flume Types I l二世 ) .........................................................2-41 Abrasion (Culverts ) ................................................................................................................1-56 Acidic Soils ............................................................................................................................1-56 Additional Pay Lengths (Culverts ) ..........................................................................................1-39 Connecting Bands ............................................................................................................1-39 Elbows .............................................................................................................................1-39安克雷奇(Culvert ) ...............................................................................................................1-55 Articulated Concrete布拉克Ditch Lining .................................................................................2-48 As-Built Plans .......................................................................................................................... 书1
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信