{"title":"Data-Driven 4D Visualization for Simulating Highway Construction Processes","authors":"Chen Guojun, Liu Yan, Chen Jingxiang, Wu Wei","doi":"10.1109/PADS.2012.13","DOIUrl":null,"url":null,"abstract":"This paper presents a method which discretizes long and narrow belt-shaped structure into sequence of cross-sections and creates cross-section models automatically based on the real construction data. Then completion and schedule model of construction are obtained by connecting cross-section schedule models. This Method reduces data volumes effectively and improves automation degree and scalability of modeling constructions. The experiment has shown that this system is full-featured, the modeling and visualization of construction processes can meet the requirement of real-time.","PeriodicalId":299627,"journal":{"name":"2012 ACM/IEEE/SCS 26th Workshop on Principles of Advanced and Distributed Simulation","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 ACM/IEEE/SCS 26th Workshop on Principles of Advanced and Distributed Simulation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PADS.2012.13","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper presents a method which discretizes long and narrow belt-shaped structure into sequence of cross-sections and creates cross-section models automatically based on the real construction data. Then completion and schedule model of construction are obtained by connecting cross-section schedule models. This Method reduces data volumes effectively and improves automation degree and scalability of modeling constructions. The experiment has shown that this system is full-featured, the modeling and visualization of construction processes can meet the requirement of real-time.