Real-Time Online Risk Monitoring and Management Method for Maintenance Optimization in Nuclear Power Plant

Anqi Xu, Zhijian Zhang, Zhang Huazhi, Min Zhang, He Wang, Yingfei Ma, Sijuan Chen, Yan Wang, Gang-yang Zheng
{"title":"Real-Time Online Risk Monitoring and Management Method for Maintenance Optimization in Nuclear Power Plant","authors":"Anqi Xu, Zhijian Zhang, Zhang Huazhi, Min Zhang, He Wang, Yingfei Ma, Sijuan Chen, Yan Wang, Gang-yang Zheng","doi":"10.1115/ICONE26-82472","DOIUrl":null,"url":null,"abstract":"As a nuclear power plant system configuration risk assessment tool, Risk Monitor (RM) can periodically update Living-PSA risk monitoring model to calculate risk information. It not only provides operating personnel with the real-time risk information, but also reduces human error in test and maintenance work, in order to ensure that the high-risk configurations are identified and controlled.\n Traditionally, the high-risk identification of planning activities is mainly based on technical specification (TS) and operating experience, etc. It is lack of quantitative risk assessment to support decision-making, especially when multiple systems or components are out of service or being restored.\n Planning risk assessment in existing risk monitors is time-consuming and error-prone, because they typically depend on manually screening and confirming risk-related planned events. Besides, online time-dependent characteristics of NPP systems are ignored. The reliability parameters are taken as constant values providing that components and systems always work under the predefined conditions. Thus, the risk level during planning period is not affected by the current configuration, or the operation history of equipment.\n With the widespread application of digital instrument control systems (I&C) in nuclear power plants, the technology of Real-time Online Risk Monitoring (RORM) was put forward. It improves the acquisition technique of current equipment status, modeling and updating technique of Living-PSA Model and provides more accurate, realistic prediction of risk level for planning configurations.\n This paper briefly introduces the design of the system structure, database, interfaces and functions of Real-time Online risk monitoring (RORM). It is characterized by the following features: online acquisition of the initial configuration before planning period, time-dependent risk monitoring modeling and updating in time. And it focuses how the real-time online risk monitoring technology of nuclear power plants help the nuclear power plant minimize the risk level of maintenance plan and optimize the maintenance schedule. Also, the calculation method of risk monitoring measures is improved based on the concept of “online, time-dependent”. Finally, the risk management method for optimization of planning activities is proposed.","PeriodicalId":237355,"journal":{"name":"Volume 2: Plant Systems, Structures, Components, and Materials; Risk Assessments and Management","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 2: Plant Systems, Structures, Components, and Materials; Risk Assessments and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ICONE26-82472","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

As a nuclear power plant system configuration risk assessment tool, Risk Monitor (RM) can periodically update Living-PSA risk monitoring model to calculate risk information. It not only provides operating personnel with the real-time risk information, but also reduces human error in test and maintenance work, in order to ensure that the high-risk configurations are identified and controlled. Traditionally, the high-risk identification of planning activities is mainly based on technical specification (TS) and operating experience, etc. It is lack of quantitative risk assessment to support decision-making, especially when multiple systems or components are out of service or being restored. Planning risk assessment in existing risk monitors is time-consuming and error-prone, because they typically depend on manually screening and confirming risk-related planned events. Besides, online time-dependent characteristics of NPP systems are ignored. The reliability parameters are taken as constant values providing that components and systems always work under the predefined conditions. Thus, the risk level during planning period is not affected by the current configuration, or the operation history of equipment. With the widespread application of digital instrument control systems (I&C) in nuclear power plants, the technology of Real-time Online Risk Monitoring (RORM) was put forward. It improves the acquisition technique of current equipment status, modeling and updating technique of Living-PSA Model and provides more accurate, realistic prediction of risk level for planning configurations. This paper briefly introduces the design of the system structure, database, interfaces and functions of Real-time Online risk monitoring (RORM). It is characterized by the following features: online acquisition of the initial configuration before planning period, time-dependent risk monitoring modeling and updating in time. And it focuses how the real-time online risk monitoring technology of nuclear power plants help the nuclear power plant minimize the risk level of maintenance plan and optimize the maintenance schedule. Also, the calculation method of risk monitoring measures is improved based on the concept of “online, time-dependent”. Finally, the risk management method for optimization of planning activities is proposed.
核电站维修优化风险实时在线监测与管理方法
risk Monitor (RM)作为核电站系统配置风险评估工具,可以定期更新Living-PSA风险监测模型,计算风险信息。它不仅为操作人员提供实时的风险信息,还可以减少测试和维护工作中的人为错误,从而确保识别和控制高风险配置。传统上,规划活动的高风险识别主要基于技术规范(TS)和操作经验等。缺乏定量的风险评估来支持决策,特别是当多个系统或组件停止服务或正在恢复时。在现有的风险监控器中规划风险评估既耗时又容易出错,因为它们通常依赖于人工筛选和确认与风险相关的计划事件。此外,忽略了核电厂系统的在线时变特性。在保证部件和系统始终在预定条件下工作的前提下,可靠性参数取恒定值。因此,规划期间的风险级别不受当前配置或设备运行历史的影响。随着数字仪表控制系统(I&C)在核电站的广泛应用,提出了实时在线风险监测(RORM)技术。改进了当前设备状态的采集技术、Living-PSA模型的建模和更新技术,为规划配置提供了更准确、更现实的风险水平预测。本文简要介绍了实时在线风险监测系统的系统结构、数据库、接口和功能的设计。其特点是在规划期前在线获取初始配置,建立时变风险监测模型并及时更新。重点研究了核电站实时在线风险监测技术如何帮助核电站降低维修计划的风险水平,优化维修计划。基于“在线、时变”的概念,改进了风险监测措施的计算方法。最后,提出了优化规划活动的风险管理方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信