{"title":"The use of preemptive priority-based scheduling for space applications","authors":"C. Bailey, E. Fyfe, T. Vardanega, A. Wellings","doi":"10.1109/REAL.1993.393492","DOIUrl":null,"url":null,"abstract":"In January 1991, the European Space Agency commissioned a study into the practicality of using process-based scheduling techniques in an on-board application environment, with Ada as the implementation language. The short paper summarizes the results of that study.<<ETX>>","PeriodicalId":198313,"journal":{"name":"1993 Proceedings Real-Time Systems Symposium","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"15","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1993 Proceedings Real-Time Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REAL.1993.393492","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 15
Abstract
In January 1991, the European Space Agency commissioned a study into the practicality of using process-based scheduling techniques in an on-board application environment, with Ada as the implementation language. The short paper summarizes the results of that study.<>