A Risk Assessment Model for Exploitation of New Technologies

A. Khamseh
{"title":"A Risk Assessment Model for Exploitation of New Technologies","authors":"A. Khamseh","doi":"10.30699/ijrrs.5.2.12","DOIUrl":null,"url":null,"abstract":"Considering the importance of risk assessment for exploitation projects of new technologies in the manufacturing power plant equipment industry in MAPNA Group, a suitable model for assessing the related risks was extracted, along with identifying and ranking the factors affecting it. This study was carried out using the library-field method, and data collection tools were questionnaires and interviews. It should be noted that with the review of the literature and study of the related research along with the expert viewpoints, a number of 78 measured variables affecting the risk assessment model for the exploitation of technologies in the power generation industry were extracted. Finally, 43 measured variables that affect the mentioned model were determined after screening by expert judgment and university professors in the form of 8 latent variables. Then, a questionnaire was developed and distributed among 89 experts in the field of power plant equipment, and the completed questionnaires were collected. To test the research model's validation and goodness of fit (GOF), the variables and their effects, confirmatory factor analysis using structural equation modeling and Smart PLS software were used, and 24 measured variables were accepted. In addition, paired comparisons with the analysis of the network process and Super Decision software were used to prioritize the variables affecting the risk assessment model for the exploitation of new technologies in power plant equipment industry. The results show that the risk assessment model for exploiting new technologies in the power plant manufacturing industry includes 7 latent variables: 1-Operational and Processes 2-Human 3-Technical and Technological, 4-Environmental and Industrial, 5-Strategic, 6-Financial, and 7-Managerial. Also, ranking showed that variables such as Technical and technological, Operational and Processes, and Human ranked first to third, and financial variables ranked last.","PeriodicalId":395350,"journal":{"name":"International Journal of Reliability, Risk and Safety: Theory and Application","volume":"126 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Reliability, Risk and Safety: Theory and Application","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30699/ijrrs.5.2.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Considering the importance of risk assessment for exploitation projects of new technologies in the manufacturing power plant equipment industry in MAPNA Group, a suitable model for assessing the related risks was extracted, along with identifying and ranking the factors affecting it. This study was carried out using the library-field method, and data collection tools were questionnaires and interviews. It should be noted that with the review of the literature and study of the related research along with the expert viewpoints, a number of 78 measured variables affecting the risk assessment model for the exploitation of technologies in the power generation industry were extracted. Finally, 43 measured variables that affect the mentioned model were determined after screening by expert judgment and university professors in the form of 8 latent variables. Then, a questionnaire was developed and distributed among 89 experts in the field of power plant equipment, and the completed questionnaires were collected. To test the research model's validation and goodness of fit (GOF), the variables and their effects, confirmatory factor analysis using structural equation modeling and Smart PLS software were used, and 24 measured variables were accepted. In addition, paired comparisons with the analysis of the network process and Super Decision software were used to prioritize the variables affecting the risk assessment model for the exploitation of new technologies in power plant equipment industry. The results show that the risk assessment model for exploiting new technologies in the power plant manufacturing industry includes 7 latent variables: 1-Operational and Processes 2-Human 3-Technical and Technological, 4-Environmental and Industrial, 5-Strategic, 6-Financial, and 7-Managerial. Also, ranking showed that variables such as Technical and technological, Operational and Processes, and Human ranked first to third, and financial variables ranked last.
新技术开发的风险评估模型
考虑到MAPNA集团制造型电厂装备行业新技术开发项目风险评估的重要性,提取了合适的风险评估模型,并对影响新技术开发项目风险的因素进行了识别和排序。本研究采用图书馆实地调查法,资料收集工具为问卷调查和访谈。需要指出的是,通过对相关文献的梳理和研究,结合专家观点,提炼出影响发电行业技术开发风险评估模型的78个测量变量。最后,通过专家判断和大学教授的筛选,以8个潜在变量的形式确定了43个影响上述模型的测量变量。然后,对电厂设备领域的89名专家进行问卷调查,并收集问卷。为了检验研究模型的有效性和拟合优度(GOF)、变量及其影响,采用结构方程建模和Smart PLS软件进行验证性因子分析,共接受了24个测量变量。此外,利用网络过程分析和Super Decision软件对影响电厂设备行业新技术开发风险评估模型的变量进行了排序。结果表明,电厂制造业新技术开发风险评估模型包含7个潜在变量:1、运营与流程2、人力3、技术与技术4、环境与产业5、战略6、财务7、管理7。另外,从排名上看,“技术与技术”、“运营与流程”、“人力”等变量排在第1 ~ 3位,“财务”变量排在最后。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信