{"title":"MULTI-MODE RESOURCE CONSTRAINED MULTI PROJECT SCHEDULING PROBLEM OPTIMIZATION WITH SYMBIOTIC ORGANISMS SEARCH","authors":"Valentinus Alvin Hodianto, Yang I-Tung","doi":"10.9744/duts.9.1.77-96","DOIUrl":null,"url":null,"abstract":"Multi-mode resource-constrained multi project scheduling problem (MRCMPSP) is the extension of standard resource constrained project scheduling problem which considers multiple activity execution modes and multiple projects, subject to precedence and resource constraints. Multiple execution modes allow the activities to have different duration and resource requirement. Furthermore, companies and project managers normally also handle many projects. This study proposed metaheuristic method Symbiotic Organisms Search (SOS) along with random-key (RK) representations, parallel schedule generation scheme (P-SGS), and forward backward scheduling, to find the feasible schedule and minimal project duration of the project portfolio. The evaluation results from standard benchmark instances shows that SOS can get the best solution in most of the tested instances and also achieve better solution in some of them. The validation results from real project case MRCMPSP show that SOS has better performance than other tested metaheuristic methods, namely GA and PSO. Thus, validate the performance of SOS.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dimensi Utama Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9744/duts.9.1.77-96","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Multi-mode resource-constrained multi project scheduling problem (MRCMPSP) is the extension of standard resource constrained project scheduling problem which considers multiple activity execution modes and multiple projects, subject to precedence and resource constraints. Multiple execution modes allow the activities to have different duration and resource requirement. Furthermore, companies and project managers normally also handle many projects. This study proposed metaheuristic method Symbiotic Organisms Search (SOS) along with random-key (RK) representations, parallel schedule generation scheme (P-SGS), and forward backward scheduling, to find the feasible schedule and minimal project duration of the project portfolio. The evaluation results from standard benchmark instances shows that SOS can get the best solution in most of the tested instances and also achieve better solution in some of them. The validation results from real project case MRCMPSP show that SOS has better performance than other tested metaheuristic methods, namely GA and PSO. Thus, validate the performance of SOS.
基于共生生物搜索的多模式资源约束多项目调度问题优化
多模式资源约束多项目调度问题(MRCMPSP)是标准资源约束项目调度问题的扩展,它考虑了受优先级和资源约束的多活动执行模式和多个项目。多种执行模式允许活动具有不同的持续时间和资源需求。此外,公司和项目经理通常也处理许多项目。本文提出了共生生物搜索(SOS)的元启发式方法,结合随机密钥(RK)表示、并行进度生成方案(P-SGS)和正向向后调度,寻找项目组合的可行进度和最小工期。标准基准实例的评价结果表明,SOS在大多数测试实例中都能得到最优解,在一些测试实例中也能得到较好的解。实际工程实例MRCMPSP的验证结果表明,SOS比其他经过测试的元启发式方法(即GA和PSO)具有更好的性能。因此,验证SOS的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信