An industrial case study on requirements volatility measures

A. Loconsole, J. Börstler
{"title":"An industrial case study on requirements volatility measures","authors":"A. Loconsole, J. Börstler","doi":"10.1109/APSEC.2005.38","DOIUrl":null,"url":null,"abstract":"Requirements volatility is an important risk factor for software projects. Software measures can help in quantifying and predicting this risk. In this paper, we present an industrial case study that investigated measures of volatility for a medium size software project. The goal of the study was twofold: 1) to empirically validate a set of measures associated with the volatility of use case models (UCM); 2) to investigate the correlation between subjective and objective volatility. Measurement data was collected in retrospect for all use case models of the software project. In addition, we determined subjective volatility by interviewing stakeholders of the project. Our data analysis showed a high correlation between our measures of size of UCM and total number of changes, indicating that the measures of size of UCMs are good indicators of requirements volatility. No correlations was found between subjective and objective volatility. These results suggest that project managers at this company should measure their projects because of the risk to take wrong decisions based on their own and the developer's perceptions.","PeriodicalId":359862,"journal":{"name":"12th Asia-Pacific Software Engineering Conference (APSEC'05)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"43","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"12th Asia-Pacific Software Engineering Conference (APSEC'05)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APSEC.2005.38","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 43

Abstract

Requirements volatility is an important risk factor for software projects. Software measures can help in quantifying and predicting this risk. In this paper, we present an industrial case study that investigated measures of volatility for a medium size software project. The goal of the study was twofold: 1) to empirically validate a set of measures associated with the volatility of use case models (UCM); 2) to investigate the correlation between subjective and objective volatility. Measurement data was collected in retrospect for all use case models of the software project. In addition, we determined subjective volatility by interviewing stakeholders of the project. Our data analysis showed a high correlation between our measures of size of UCM and total number of changes, indicating that the measures of size of UCMs are good indicators of requirements volatility. No correlations was found between subjective and objective volatility. These results suggest that project managers at this company should measure their projects because of the risk to take wrong decisions based on their own and the developer's perceptions.
一个关于需求波动度量的工业案例研究
需求波动是软件项目的一个重要风险因素。软件度量可以帮助量化和预测这种风险。在本文中,我们提出了一个工业案例研究,该研究调查了中型软件项目的波动性度量。该研究的目标是双重的:1)经验验证与用例模型(UCM)的波动性相关的一组度量;2)考察主观波动率与客观波动率的相关性。为软件项目的所有用例模型在回顾中收集度量数据。此外,我们通过采访项目的涉众来确定主观波动性。我们的数据分析显示了我们的UCM大小度量和变更总数之间的高度相关性,表明UCM大小度量是需求波动的良好指示器。主观波动率与客观波动率之间无相关性。这些结果表明,该公司的项目经理应该衡量他们的项目,因为有可能根据他们自己和开发人员的看法做出错误的决定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信