Using Resources as Synchronizers to Manage Mobile Process Adaptation

Paolo Bottoni, F. Rosa, Massimo Mecella
{"title":"Using Resources as Synchronizers to Manage Mobile Process Adaptation","authors":"Paolo Bottoni, F. Rosa, Massimo Mecella","doi":"10.14279/TUJ.ECEASST.12.232.266","DOIUrl":null,"url":null,"abstract":"Process management in Mobile Ad-hoc NETworks (MANETs) has to deal with different types of tasks and resources. Teams can be formed with specific goals, such as recognition of a damaged area for disaster assessment, where each member of a team is assigned some task to be performed according to some policy. However, in real situations, it is possible that task assignments and policies have to be revised due to different causes. In addition to typical causes for dynamic changes in adaptive workflows, mobility introduces some specific problems, e.g. the need for new connectivity-maintaining tasks, or reassignment of tasks originally for members who have become unreachable, or who have no sufficient resources to complete the original plan. As these modifications occur dynamically, it is difficult to manage them through hard-coded programs. Rather, we propose the use of a rule-based formalism, expressed in terms of multi-set rewriting. This supports a resource-centered view, in which both data-dependencies between tasks and plan-dependent ordering of tasks are expressed as production and consumption of resources of different types. In turn, rules are themselves seen as resources, so that they are prone to the same rewriting process, in order to redefine process schemas. The paper illustrates these notions and formalisms, and shows some cases of their application.","PeriodicalId":329764,"journal":{"name":"Electronic Communication of The European Association of Software Science and Technology","volume":"560 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electronic Communication of The European Association of Software Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14279/TUJ.ECEASST.12.232.266","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Process management in Mobile Ad-hoc NETworks (MANETs) has to deal with different types of tasks and resources. Teams can be formed with specific goals, such as recognition of a damaged area for disaster assessment, where each member of a team is assigned some task to be performed according to some policy. However, in real situations, it is possible that task assignments and policies have to be revised due to different causes. In addition to typical causes for dynamic changes in adaptive workflows, mobility introduces some specific problems, e.g. the need for new connectivity-maintaining tasks, or reassignment of tasks originally for members who have become unreachable, or who have no sufficient resources to complete the original plan. As these modifications occur dynamically, it is difficult to manage them through hard-coded programs. Rather, we propose the use of a rule-based formalism, expressed in terms of multi-set rewriting. This supports a resource-centered view, in which both data-dependencies between tasks and plan-dependent ordering of tasks are expressed as production and consumption of resources of different types. In turn, rules are themselves seen as resources, so that they are prone to the same rewriting process, in order to redefine process schemas. The paper illustrates these notions and formalisms, and shows some cases of their application.
使用资源作为同步器来管理移动流程适配
移动自组织网络(manet)中的进程管理必须处理不同类型的任务和资源。团队可以有特定的目标,比如识别受损区域进行灾难评估,团队的每个成员被分配一些任务,根据一些策略来执行。然而,在实际情况中,由于各种原因,任务分配和政策可能不得不进行修改。除了自适应工作流中动态变化的典型原因之外,移动性还引入了一些特定的问题,例如需要新的连接维护任务,或者重新分配原本为无法到达的成员分配的任务,或者没有足够的资源来完成原始计划的成员。由于这些修改是动态发生的,因此很难通过硬编码程序来管理它们。相反,我们建议使用基于规则的形式主义,以多集重写的方式表达。这支持以资源为中心的视图,其中任务之间的数据依赖关系和任务的计划依赖排序都表示为不同类型资源的生产和消耗。反过来,规则本身被视为资源,因此它们易于进行相同的重写过程,以便重新定义流程模式。本文阐述了这些概念和形式,并给出了一些应用实例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信