Review Of Project Delay Factors On Project Cost Explanation : Lampung Sugar Factory – Mill House

Jujuk Kusumawati, Rolan Mediana Silaban
{"title":"Review Of Project Delay Factors On Project Cost Explanation : Lampung Sugar Factory – Mill House","authors":"Jujuk Kusumawati, Rolan Mediana Silaban","doi":"10.32832/inova-tif.v5i1.7928","DOIUrl":null,"url":null,"abstract":"The problem of delays in the construction industry is a national phenomenon and Jakarta is no exception. The main purpose of this study is to identify the factors of project delays and their effects on cost overruns for building projects in Jakarta. ) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) subcontractors. Then an analytical survey was conducted which was distributed to 26 respondents. The ten delay factors were analyzed to determine their effect on project cost overruns. From the results of the analysis it can be seen that: (1) office overhead (2) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) Subcontractors have their respective weights of influence on project cost overruns","PeriodicalId":389522,"journal":{"name":"Jurnal Inovatif : Inovasi Teknologi Informasi dan Informatika","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Inovatif : Inovasi Teknologi Informasi dan Informatika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32832/inova-tif.v5i1.7928","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The problem of delays in the construction industry is a national phenomenon and Jakarta is no exception. The main purpose of this study is to identify the factors of project delays and their effects on cost overruns for building projects in Jakarta. ) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) subcontractors. Then an analytical survey was conducted which was distributed to 26 respondents. The ten delay factors were analyzed to determine their effect on project cost overruns. From the results of the analysis it can be seen that: (1) office overhead (2) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) Subcontractors have their respective weights of influence on project cost overruns
项目成本解释中的项目延迟因素综述:南榜糖厂-磨屋
建筑业的延误问题是一个全国性的现象,雅加达也不例外。本研究的主要目的是确定项目延误的因素及其对雅加达建筑项目成本超支的影响。承包商经验,(3)工作方法(4)材料延迟,(5)工具动员(6)预制材料制造(7)工作质量(8)工人素质(9)现场现金流(10)分包商。然后对26名受访者进行了分析性调查。分析了10个延迟因素,以确定它们对项目成本超支的影响。从分析结果可以看出:(1)办公室费用(2)承包商经验,(3)工作方法(4)材料延迟,(5)工具动员(6)预制材料制造(7)工作质量(8)工人素质(9)现场现金流(10)分包商对项目成本超支有各自的影响权重
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信