{"title":"Transmission Line Synthesis","authors":"B. Krauter, Rohinish Gupta, J. Willis, L. Pileggi","doi":"10.1145/217474.217555","DOIUrl":null,"url":null,"abstract":"RLC transmission line synthesis is a difficult problem because minimal net delay cannot be achieved or accurately predicted unless: 1) a termination scheme is chosen and properly implemented, and 2) output driver transition rates are constrained at or below the net's capability. This paper describes a method to concurrently find, for any RLC net, an optimal termination value, a maximum source transition rate, and an approximate net delay using the first few response moments. When optimal termination is accomplished and transition rates do not exceed the capabilities of the net, the resulting delay metrics are an interesting extension of the popular Elmore delay metric for RC interconnects. The task of physical RLC interconnect design is facilitated by the ease with which these first few moments are calculated for generalized RLC lines.","PeriodicalId":422297,"journal":{"name":"32nd Design Automation Conference","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"24","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"32nd Design Automation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/217474.217555","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 24

Abstract

RLC transmission line synthesis is a difficult problem because minimal net delay cannot be achieved or accurately predicted unless: 1) a termination scheme is chosen and properly implemented, and 2) output driver transition rates are constrained at or below the net's capability. This paper describes a method to concurrently find, for any RLC net, an optimal termination value, a maximum source transition rate, and an approximate net delay using the first few response moments. When optimal termination is accomplished and transition rates do not exceed the capabilities of the net, the resulting delay metrics are an interesting extension of the popular Elmore delay metric for RC interconnects. The task of physical RLC interconnect design is facilitated by the ease with which these first few moments are calculated for generalized RLC lines.
传输线综合
RLC传输线合成是一个难题,因为最小的网络延迟无法实现或准确预测,除非:1)选择并适当实施终止方案,2)输出驱动器转换速率被限制在或低于网络的能力。本文描述了一种利用前几个响应矩同时求任意RLC网络的最优终止值、最大源跃迁率和近似净延迟的方法。当完成最佳终止并且转换速率不超过网络的能力时,所得到的延迟度量是RC互连中流行的Elmore延迟度量的有趣扩展。物理RLC互连设计的任务是方便的,这些最初的几个矩计算广义RLC线路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信