{"title":"TIME REDUCTION TESTS OF RELIABILITY ELECTRICAL EQUIPMENT","authors":"A. Rusin","doi":"10.46573/2658-7459-2020-3-60-68","DOIUrl":null,"url":null,"abstract":"It is noted that improving materials and technologies leads to increased reliability of electrical equipment. It is shown that аt the same time, the time for testing new equipment samples for reliability increases and the cost of carrying them out increases. Research results are given that can reduce the time of testing equipment for reliability.","PeriodicalId":329094,"journal":{"name":"Bulletin of the Tver State Technical University. Series «Building. Electrical engineering and chemical technology»","volume":"65 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the Tver State Technical University. Series «Building. Electrical engineering and chemical technology»","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46573/2658-7459-2020-3-60-68","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
It is noted that improving materials and technologies leads to increased reliability of electrical equipment. It is shown that аt the same time, the time for testing new equipment samples for reliability increases and the cost of carrying them out increases. Research results are given that can reduce the time of testing equipment for reliability.