A

S. Waltoś
{"title":"A","authors":"S. Waltoś","doi":"10.1515/9783110636857-004","DOIUrl":null,"url":null,"abstract":"Purpose – The purpose of this paper is to present a theoretical framework for capacity building in post disaster construction and demolition (C&D) waste management at a national level to address the identified capacity gaps in managing disaster waste resulting from natural hazards. Design/methodology/approach – Data were gathered through pilot interviews, case studies and expert opinion surveys representing government, non-government and other sector organisations involved in post disaster waste management. Findings – The study revealed unavailability of a single point of responsibility and provision for disaster waste in existing policies and capacity constraints in prevailing peace time solid waste management practices which were identified as major capacity gaps. Establishment of a regulatory body and enforceable rules and regulations with necessary levels of capacities was identified and presented in a theoretical framework comprising of seven identified areas for capacity building in post disaster waste management. Research limitations/implications – This study is limited to disaster C&D waste as debris generated from totally or partially damaged buildings and infrastructure as a direct impact of natural hazards or from demolished buildings and infrastructure at rehabilitation or early recovery stages. Waste generated during reconstruction phase of post disaster management cycle is not considered as disaster C&D waste for purposes of this study. Originality/value – The research enabled analysis of existing capacities and presents approaches for capacity building for identified gaps in post disaster C&D waste management to attain sustainable post disaster waste management for future resilience.","PeriodicalId":305997,"journal":{"name":"Müllers Großes Deutsches Ortsbuch 2019","volume":"282 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Müllers Großes Deutsches Ortsbuch 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/9783110636857-004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose – The purpose of this paper is to present a theoretical framework for capacity building in post disaster construction and demolition (C&D) waste management at a national level to address the identified capacity gaps in managing disaster waste resulting from natural hazards. Design/methodology/approach – Data were gathered through pilot interviews, case studies and expert opinion surveys representing government, non-government and other sector organisations involved in post disaster waste management. Findings – The study revealed unavailability of a single point of responsibility and provision for disaster waste in existing policies and capacity constraints in prevailing peace time solid waste management practices which were identified as major capacity gaps. Establishment of a regulatory body and enforceable rules and regulations with necessary levels of capacities was identified and presented in a theoretical framework comprising of seven identified areas for capacity building in post disaster waste management. Research limitations/implications – This study is limited to disaster C&D waste as debris generated from totally or partially damaged buildings and infrastructure as a direct impact of natural hazards or from demolished buildings and infrastructure at rehabilitation or early recovery stages. Waste generated during reconstruction phase of post disaster management cycle is not considered as disaster C&D waste for purposes of this study. Originality/value – The research enabled analysis of existing capacities and presents approaches for capacity building for identified gaps in post disaster C&D waste management to attain sustainable post disaster waste management for future resilience.
一个
目的-本文的目的是为国家一级的灾后建筑和拆除(C&D)废物管理能力建设提供一个理论框架,以解决在管理自然灾害造成的灾害废物方面确定的能力差距。设计/方法/方法-透过试点访谈、个案研究,以及代表参与灾后废物管理的政府、非政府及其他界别机构的专家意见调查,收集数据。调查结果-该研究揭示了现有政策中无法提供灾害废物的单点责任和规定,以及和平时期普遍存在的固体废物管理实践中的能力限制,这些被确定为主要的能力差距。在一个理论框架内确定并提出了建立一个具有必要能力水平的管理机构和可执行的规则和条例,该框架包括灾后废物管理能力建设的七个确定领域。研究局限/影响-本研究仅限于灾害建设废物,即完全或部分受损的建筑物和基础设施在自然灾害的直接影响下产生的碎片,或在重建或早期恢复阶段被拆除的建筑物和基础设施产生的碎片。灾后管理周期重建阶段产生的废弃物,在本研究中不被视为灾后建设废弃物。原创性/价值-该研究能够分析现有能力,并提出能力建设方法,以弥补灾后C&D废物管理中已确定的差距,从而实现可持续的灾后废物管理,以提高未来的复原力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书