{"title":"Reliability modeling of hard real-time systems","authors":"Hagbae Kim, A. White, K. Shin","doi":"10.1109/FTCS.1998.689481","DOIUrl":null,"url":null,"abstract":"A hard real-time control system, such as a fly-by-wire system, fails catastrophically (e.g., lose stability) if its control input is not updated by its digital controller computer within a certain time limit called the hard deadline. To assess and validate system reliability by using a semi-Markov model that explicitly contains the deadline information, we propose a path-space approach deriving the upper and lower bounds of the probability of system failure. These bounds are derived by using only simple parameters, and they are especially suitable for highly-reliable systems which must recover quickly. Analytical bounds are derived for both exponential and Weibull failure distributions, which have proven effective through numerical examples, while considering three repair strategies: repair-as-good-as-new, repair-as-good-as-old, and repair-better-than-old.","PeriodicalId":270871,"journal":{"name":"Digest of Papers. Twenty-Eighth Annual International Symposium on Fault-Tolerant Computing (Cat. No.98CB36224)","volume":"140 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1998-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Digest of Papers. Twenty-Eighth Annual International Symposium on Fault-Tolerant Computing (Cat. No.98CB36224)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FTCS.1998.689481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11
Abstract
A hard real-time control system, such as a fly-by-wire system, fails catastrophically (e.g., lose stability) if its control input is not updated by its digital controller computer within a certain time limit called the hard deadline. To assess and validate system reliability by using a semi-Markov model that explicitly contains the deadline information, we propose a path-space approach deriving the upper and lower bounds of the probability of system failure. These bounds are derived by using only simple parameters, and they are especially suitable for highly-reliable systems which must recover quickly. Analytical bounds are derived for both exponential and Weibull failure distributions, which have proven effective through numerical examples, while considering three repair strategies: repair-as-good-as-new, repair-as-good-as-old, and repair-better-than-old.