A REVIEW OF TIME MANAGEMENT FACTORS IN CONSTRUCTION PROJECT DELIVERY

S. Shehu
{"title":"A REVIEW OF TIME MANAGEMENT FACTORS IN CONSTRUCTION PROJECT DELIVERY","authors":"S. Shehu","doi":"10.22452/jpmp.vol1no2.3","DOIUrl":null,"url":null,"abstract":"A recurring challenge encountered by numerous stakeholders globally in the building construction sector is delay in project delivery. Time management is an indispensable chain among numerous processes required to achieve successful project delivery. In the built environment there is a common consensus that timely completion, quality criterion and completion within cost estimate are the major performance deliverables considered in appraising the successes of construction project. However, poor compliance with time management processes occasioned with paucity of information on specific principles as well as practices influencing time management seems to have contributed a lot to failure on timely delivery of construction project most especially in Nigeria. The study was conducted using qualitative research design in which information was basically obtained from available literature sources which were sorted out and categorized in to relevant factors. This paper finds out through review factors relevant to successful construction project delivery. Findings revealed that thirty-one (31) time management factors were identified and categorized in to: influencing processes, principles and practices. In conclusion, time management per se is actually managing our behaviours in relation to time. Hence, this study recommends solutions that will ensure effective and efficient construction project delivery. Keywords: Construction Project Delivery, Practices, Principles, Processes, Time Management","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management Practice","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22452/jpmp.vol1no2.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

A recurring challenge encountered by numerous stakeholders globally in the building construction sector is delay in project delivery. Time management is an indispensable chain among numerous processes required to achieve successful project delivery. In the built environment there is a common consensus that timely completion, quality criterion and completion within cost estimate are the major performance deliverables considered in appraising the successes of construction project. However, poor compliance with time management processes occasioned with paucity of information on specific principles as well as practices influencing time management seems to have contributed a lot to failure on timely delivery of construction project most especially in Nigeria. The study was conducted using qualitative research design in which information was basically obtained from available literature sources which were sorted out and categorized in to relevant factors. This paper finds out through review factors relevant to successful construction project delivery. Findings revealed that thirty-one (31) time management factors were identified and categorized in to: influencing processes, principles and practices. In conclusion, time management per se is actually managing our behaviours in relation to time. Hence, this study recommends solutions that will ensure effective and efficient construction project delivery. Keywords: Construction Project Delivery, Practices, Principles, Processes, Time Management
建设项目交付中的时间管理因素综述
全球建筑行业众多利益相关者经常遇到的一个挑战是项目交付延迟。时间管理是实现项目成功交付所需的众多过程中不可或缺的环节。在建筑环境中,人们普遍认为,及时完成、质量标准和在成本估算范围内完成是评价建设项目成功的主要绩效可交付成果。然而,由于缺乏关于影响时间管理的具体原则和做法的信息,因而未能遵守时间管理程序,这似乎是导致建筑项目未能及时交付的主要原因,尤其是在尼日利亚。本研究采用定性研究设计,基本从现有文献资料中获取信息,并对相关因素进行整理和分类。本文通过回顾,找出了影响建设项目成功交付的因素。调查结果显示,确定了31个时间管理因素,并将其分类为:影响过程、原则和实践。总之,时间管理本身实际上是管理我们与时间有关的行为。因此,本研究建议的解决方案将确保有效和高效的建设项目交付。关键词:建设项目交付,实践,原则,过程,时间管理
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信