Study of hybrid PV-diesel power generation system at Sebira Island-Kepulauan Seribu

A. Purwadi, Y. Haroen, M. Zamroni, N. Heryana, A. Saryanto
{"title":"Study of hybrid PV-diesel power generation system at Sebira Island-Kepulauan Seribu","authors":"A. Purwadi, Y. Haroen, M. Zamroni, N. Heryana, A. Saryanto","doi":"10.1109/ICPERE.2012.6287251","DOIUrl":null,"url":null,"abstract":"Sebira Islands is one of the islands in Kepulauan Seribu, Jakarta. This island located at the the north end of the Kepulauan Seribu and not connected to submarine power cable network so that the electricity on this island is limited and only rely on diesel generator set. The government of Jakarta in cooperation with PT. CNOOC and LAPI-ITB are planning to revitalize the system by rebuilding hybrid power system between Photovoltaic panel and Diesel generator set on Sebira Island. This paper aims to make an analytical study for determining the appropriate design. The design was simulated with Homer software and then analyzed technically and economically. In this paper, some design system has been proposed on different scheme. The design has been simulated and the sensitivity analysis has been made on changing of load and fuel cost. The analysis showed that the most feasible scheme to be applied on Sebira Island is the scheme with the percentage fraction of PV and Diesel between 50-70%.","PeriodicalId":303729,"journal":{"name":"2012 International Conference on Power Engineering and Renewable Energy (ICPERE)","volume":"150 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on Power Engineering and Renewable Energy (ICPERE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPERE.2012.6287251","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

Sebira Islands is one of the islands in Kepulauan Seribu, Jakarta. This island located at the the north end of the Kepulauan Seribu and not connected to submarine power cable network so that the electricity on this island is limited and only rely on diesel generator set. The government of Jakarta in cooperation with PT. CNOOC and LAPI-ITB are planning to revitalize the system by rebuilding hybrid power system between Photovoltaic panel and Diesel generator set on Sebira Island. This paper aims to make an analytical study for determining the appropriate design. The design was simulated with Homer software and then analyzed technically and economically. In this paper, some design system has been proposed on different scheme. The design has been simulated and the sensitivity analysis has been made on changing of load and fuel cost. The analysis showed that the most feasible scheme to be applied on Sebira Island is the scheme with the percentage fraction of PV and Diesel between 50-70%.
Sebira岛- kepulauan Seribu光伏-柴油混合发电系统研究
西比拉群岛是雅加达西里武吉普劳岛的一个岛屿。这个岛位于Kepulauan Seribu的北端,没有连接到海底电力电缆网络,因此岛上的电力有限,只能依靠柴油发电机组。雅加达政府正与PT. CNOOC和LAPI-ITB合作,计划通过在Sebira岛上重建光伏板和柴油发电机组之间的混合电力系统来振兴该系统。本文旨在为确定合适的设计进行分析研究。利用Homer软件对设计进行了仿真,并对设计进行了技术经济分析。本文针对不同的方案,提出了相应的设计方案。对设计进行了仿真,并对负荷变化和燃料成本变化进行了敏感性分析。分析表明,Sebira岛最可行的方案是光伏和柴油比例在50-70%之间的方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信