{"title":"Determination of Second-Life Battery Capacity and Load Rating for a Standalone E-Bike Charging Station Powered by Hybrid Renewable Energy System","authors":"Cong-Long Nguyen, Ettore Colicchio, Paolo Primiani, Louis Viglione, K. Al-haddad, L. Woodward","doi":"10.1109/CPE-POWERENG48600.2020.9161665","DOIUrl":null,"url":null,"abstract":"This paper presents the design of a standalone e-bike charging station powered by a hybrid renewable energy source including small wind turbines (WTs) and photovoltaic (PV) panels. In order to compensate the mismatch between power supply and the load demand, an energy storage system (BESS) is also included. The use of second-life lithium-ion batteries in the BESS contributes to reduce the cost of the system. A cost function composed of the total income and the cost of the BESS and the installed load charging ports is defined in order to determine the optimal second-life BESS capacity and load rating. Three constraints regarding the power of BESS, the state-of-charge (SOC) of BESS, and the loss of power supply probability are included in the optimization problem. The first and second constraints ensure that the BESS works properly, whereas the third one aims to meet the load demand. Moreover, with the lack of available historical data of the load for e-bike charging stations, a load model is developed by considering the time of the day and the weather conditions. In order to evaluate the proposed method, a case study is defined using real long-term weather data collected in Montreal, Canada and considering the design of a 1.2-kW e-bike charging station.","PeriodicalId":111104,"journal":{"name":"2020 IEEE 14th International Conference on Compatibility, Power Electronics and Power Engineering (CPE-POWERENG)","volume":"129 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 14th International Conference on Compatibility, Power Electronics and Power Engineering (CPE-POWERENG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPE-POWERENG48600.2020.9161665","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents the design of a standalone e-bike charging station powered by a hybrid renewable energy source including small wind turbines (WTs) and photovoltaic (PV) panels. In order to compensate the mismatch between power supply and the load demand, an energy storage system (BESS) is also included. The use of second-life lithium-ion batteries in the BESS contributes to reduce the cost of the system. A cost function composed of the total income and the cost of the BESS and the installed load charging ports is defined in order to determine the optimal second-life BESS capacity and load rating. Three constraints regarding the power of BESS, the state-of-charge (SOC) of BESS, and the loss of power supply probability are included in the optimization problem. The first and second constraints ensure that the BESS works properly, whereas the third one aims to meet the load demand. Moreover, with the lack of available historical data of the load for e-bike charging stations, a load model is developed by considering the time of the day and the weather conditions. In order to evaluate the proposed method, a case study is defined using real long-term weather data collected in Montreal, Canada and considering the design of a 1.2-kW e-bike charging station.
基于混合可再生能源系统的独立电动自行车充电站二次寿命电池容量和额定负载的确定
本文介绍了一个独立的电动自行车充电站的设计,该充电站采用混合可再生能源,包括小型风力涡轮机(WTs)和光伏(PV)板。为了补偿电力供应与负荷需求之间的不匹配,还引入了储能系统(BESS)。在BESS中使用二次寿命锂离子电池有助于降低系统成本。为了确定最佳的二次寿命储能系统容量和额定负载,定义了由储能系统和已安装的充电端口的总收益和成本组成的成本函数。优化问题包含了电池储能系统功率、电池荷电状态(SOC)和供电损失概率三个约束条件。第一个和第二个约束确保BESS正常工作,而第三个约束旨在满足负载需求。此外,在缺乏电动自行车充电站历史负荷数据的情况下,建立了考虑时间和天气条件的充电站负荷模型。为了评估所提出的方法,定义了一个案例研究,使用在加拿大蒙特利尔收集的真实长期天气数据,并考虑设计一个1.2千瓦的电动自行车充电站。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书