DESIGNING OF OPEN CHANNELS AND CLOSED CHANNELS FOR DRAINAGE FACILITIES IN AIRSIDE

Ajeng Teralina Listya Avandha, S. Ramadhani
{"title":"DESIGNING OF OPEN CHANNELS AND CLOSED CHANNELS FOR DRAINAGE FACILITIES IN AIRSIDE","authors":"Ajeng Teralina Listya Avandha, S. Ramadhani","doi":"10.52989/jaet.v3i2.104","DOIUrl":null,"url":null,"abstract":"Drainage facilities are one part of the airside facilities that are important to ensure the safety of the airside area when weather changes occur. This study aims to make drainage that can be carried out to ensure the safety of the airside area from stagnant water. The calculation of airside drainage refers to the planned drainage calculation rules so that the drainage channels can design accordingly so as not to interfere with the operation of other facilities. In the design of drainage work, the material requirements for making open and closed channels at Dewadaru Karimun Jawa Airport must be precisely designed so that the work takes place by the specified planning and quality standards. The research uses a mixed methodology that the exploratory study by conducting a literature study that compares observation. The analysis starts by finding the volume for each work item based on Standar Nasional Indonesia (SNI) 2052-2017, a national iron and concrete standard. The result shows the excavation of soil for making channels, the total volume required is 880.24 m3, the importance of sand is 40.76 m3, the book of substantial rebates of a mixture ratio of 1: 2: 3 is 23.82 m3, and the book of K300 Concrete works for U-Ditch type C channels (100 x 100) is 116.29 m3. For the needs of the required iron volume of 16,415.09 kg, formwork of 1,408.45 m2, stone river masonry size 100 x 100 by 139 m3, stone river masonry size 50x50 amounted to 42.05 m3, and the volume of plastering work of the channel amounted to 192.46 m2. The conclusion of this study is the accuracy of design required to calculate each work item's volume.","PeriodicalId":384794,"journal":{"name":"Journal of Airport Engineering Technology (JAET)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Airport Engineering Technology (JAET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52989/jaet.v3i2.104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Drainage facilities are one part of the airside facilities that are important to ensure the safety of the airside area when weather changes occur. This study aims to make drainage that can be carried out to ensure the safety of the airside area from stagnant water. The calculation of airside drainage refers to the planned drainage calculation rules so that the drainage channels can design accordingly so as not to interfere with the operation of other facilities. In the design of drainage work, the material requirements for making open and closed channels at Dewadaru Karimun Jawa Airport must be precisely designed so that the work takes place by the specified planning and quality standards. The research uses a mixed methodology that the exploratory study by conducting a literature study that compares observation. The analysis starts by finding the volume for each work item based on Standar Nasional Indonesia (SNI) 2052-2017, a national iron and concrete standard. The result shows the excavation of soil for making channels, the total volume required is 880.24 m3, the importance of sand is 40.76 m3, the book of substantial rebates of a mixture ratio of 1: 2: 3 is 23.82 m3, and the book of K300 Concrete works for U-Ditch type C channels (100 x 100) is 116.29 m3. For the needs of the required iron volume of 16,415.09 kg, formwork of 1,408.45 m2, stone river masonry size 100 x 100 by 139 m3, stone river masonry size 50x50 amounted to 42.05 m3, and the volume of plastering work of the channel amounted to 192.46 m2. The conclusion of this study is the accuracy of design required to calculate each work item's volume.
空侧排水设施的明渠及暗渠设计
排水设施是空侧设施的一部分,在天气发生变化时,对确保空侧区域的安全至关重要。本研究的目的是为了确保空侧区域不受滞水影响的安全而进行可进行的排水。空侧排水计算是指规划的排水计算规则,以便据此设计排水通道,以免干扰其他设施的运行。在设计排水工程时,必须精确设计Dewadaru Karimun Jawa机场的开放和封闭通道的材料要求,以便按照规定的规划和质量标准进行工作。本研究采用混合研究方法,即探索性研究通过文献研究进行比较观察。分析首先根据印度尼西亚国家标准(SNI) 2052-2017(国家铁和混凝土标准)查找每个工作项的体积。结果表明:筑渠用土开挖,所需总体积为880.24 m3,砂土重要性为40.76 m3, 1∶2∶3配合比的实质折算量为23.82 m3, K300《u型沟C型渠混凝土工程(100 × 100)》折算量为116.29 m3。所需铁量为16,415.09 kg,模板为1,408.45 m2,石河砌体尺寸为100 × 100 × 139 m3,石河砌体尺寸为50 × 50为42.05 m3,通道抹灰工程量为192.46 m2。本研究的结论是设计的准确性要求计算每个工作项目的体积。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信