{"title":"A Tool for Managing Year 2000 Projects","authors":"Ralph L. Kliem","doi":"10.1201/1078/43188.16.2.19990301/31183.15","DOIUrl":null,"url":null,"abstract":"Abstract To manage the Y2K problem rationally with a limited amount of time and resources, it is necessary to assess the risks and their corresponding magnitude and then respond accordingly. Risk management is the tool for doing that.","PeriodicalId":117295,"journal":{"name":"Inf. Syst. Manag.","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inf. Syst. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/1078/43188.16.2.19990301/31183.15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract To manage the Y2K problem rationally with a limited amount of time and resources, it is necessary to assess the risks and their corresponding magnitude and then respond accordingly. Risk management is the tool for doing that.