{"title":"Predictive Modeling Of Jobs Delay In Product Manufacturing Using Multivariate Statistics","authors":"M. Bajpai, Parvesh Sharma","doi":"10.1109/PUNECON.2018.8745385","DOIUrl":null,"url":null,"abstract":"In this paper we have investigated a method of prediction of daily number of job delays in a manufacturing line that would happen based on extraction of useful variables that contribute to the job delays in manufacturing line of products and later apply the same methodology to predict delay jobs over next two years using multivariate statistical approach.","PeriodicalId":166677,"journal":{"name":"2018 IEEE Punecon","volume":"106 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Punecon","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PUNECON.2018.8745385","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In this paper we have investigated a method of prediction of daily number of job delays in a manufacturing line that would happen based on extraction of useful variables that contribute to the job delays in manufacturing line of products and later apply the same methodology to predict delay jobs over next two years using multivariate statistical approach.