ANALISIS PERENCANAAN PENGADAAN KOMPONEN REM PESAWAT B737-800 NG BERDASARKAN SATUAN CYCLE DAN FLIGHT HOURS DI PT ABC

K. Komarudin, Djoko Suprijatmono
{"title":"ANALISIS PERENCANAAN PENGADAAN KOMPONEN REM PESAWAT B737-800 NG BERDASARKAN SATUAN CYCLE DAN FLIGHT HOURS DI PT ABC","authors":"K. Komarudin, Djoko Suprijatmono","doi":"10.54378/bt.v16i1.1730","DOIUrl":null,"url":null,"abstract":"As one of the MRO (Maintenance, Repair, Overhaul) company PT ABC had the significant problems in the last 3 years, including concerns regarding the difficulty of determining the amount of material availability and timing of procurement the material appropriate to support maintenance activities. In this case the components studied are two type brake of aircraft the first one is brake assembly and the second one is brake Goodrich which installed on B737-800 aircraft NG. Based on historical data, in last 3 years PT ABC have a number of component shortage that continues to grow, in last year PT ABC had 12 unit shortage component for brake assembly and 13 unit shortage component for brake goodrich. It is gave the negative impact for company and also customer PT ABC. To overcome these problems need to be analyzed how to determine the accuracy the number of brake requests that will removal in future periods which resulting the accuracy of the flight time (dispatch reliability/delay time). The proccess in this reserach first determine the life time of brake, determine the quantity of removal brake, schedule of removal brake, account the forecast of requirement brake in next years and determine the planning of material requirement for maintenance proccess. The forecasting using single exponential smoothing methode to determine forecasting result of brake requirement in 2017. This methode consider the smallest standar error estimate of forecasting demand to get the exact result. Morever MRP (material requirement planning) methode used to determine the procurement components planning (Petition Requirement Planning) with forecasting data from previous year's demand. Based on studies result showed that the quantity of brake assembly and brake Goodrich types that should be available for the removal of as many as 13 units per each type of brake for a period in 2017, while the limit (age component) of brake assembly 38 days and 41 days for brake Goodrich and the estimation schedule of brake removal is the last date installation brake plus the actual age of brake that has determined the schedule of brake assembly in 21st of the months 12 and the 2nd of the month 11 for brake Goodrich and result are showed that MRP decrease the shortage of brake assembly 1 unit and decrease the shortage of brake goodrich 2 unit.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"85 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bina Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54378/bt.v16i1.1730","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As one of the MRO (Maintenance, Repair, Overhaul) company PT ABC had the significant problems in the last 3 years, including concerns regarding the difficulty of determining the amount of material availability and timing of procurement the material appropriate to support maintenance activities. In this case the components studied are two type brake of aircraft the first one is brake assembly and the second one is brake Goodrich which installed on B737-800 aircraft NG. Based on historical data, in last 3 years PT ABC have a number of component shortage that continues to grow, in last year PT ABC had 12 unit shortage component for brake assembly and 13 unit shortage component for brake goodrich. It is gave the negative impact for company and also customer PT ABC. To overcome these problems need to be analyzed how to determine the accuracy the number of brake requests that will removal in future periods which resulting the accuracy of the flight time (dispatch reliability/delay time). The proccess in this reserach first determine the life time of brake, determine the quantity of removal brake, schedule of removal brake, account the forecast of requirement brake in next years and determine the planning of material requirement for maintenance proccess. The forecasting using single exponential smoothing methode to determine forecasting result of brake requirement in 2017. This methode consider the smallest standar error estimate of forecasting demand to get the exact result. Morever MRP (material requirement planning) methode used to determine the procurement components planning (Petition Requirement Planning) with forecasting data from previous year's demand. Based on studies result showed that the quantity of brake assembly and brake Goodrich types that should be available for the removal of as many as 13 units per each type of brake for a period in 2017, while the limit (age component) of brake assembly 38 days and 41 days for brake Goodrich and the estimation schedule of brake removal is the last date installation brake plus the actual age of brake that has determined the schedule of brake assembly in 21st of the months 12 and the 2nd of the month 11 for brake Goodrich and result are showed that MRP decrease the shortage of brake assembly 1 unit and decrease the shortage of brake goodrich 2 unit.
根据PT ABC的飞行周期和飞行时间,飞机的制动器组件B737-800 NG的规划分析
作为MRO(维护、修理、大修)公司之一,PT ABC在过去3年里遇到了重大问题,包括难以确定可用材料的数量和采购时间,以支持维护活动。本案例研究了两种类型的飞机制动器,第一种是制动器总成,第二种是安装在B737-800 NG飞机上的制动器古德里奇。根据历史数据,在过去的3年里,PT ABC的零部件短缺数量持续增长,去年PT ABC的制动组件短缺12个单位,制动产品短缺13个单位。这给公司和客户PT ABC带来了负面影响。为了克服这些问题,需要分析如何确定将在未来一段时间内移除的制动请求数量的准确性,从而导致飞行时间的准确性(调度可靠性/延迟时间)。本研究的过程首先确定了制动器的寿命,确定了制动器的拆卸量,拆卸计划,对制动器未来几年的需求进行预测,并确定了维修过程的材料需求计划。采用单指数平滑法进行预测,确定2017年制动需求预测结果。该方法考虑了预测需求的最小标准误差估计,以获得准确的预测结果。此外,MRP(物料需求计划)方法用于确定采购组件计划(请愿需求计划)与预测数据从前一年的需求。根据研究结果显示,在2017年的一段时间内,每种类型的制动器应可用于拆卸多达13个单元的制动器组件和制动器古德里奇类型的数量。而刹车装置的限制(组件)岁38天,制动Goodrich 41天,估计刹车去除是最后日期的时间表安装制动加制动器的实际年龄决定了刹车总成明细表的21个月12和11月的第二制动古德里奇和结果表明,MRP减少刹车总成1单位的短缺和减少制动Goodrich的短缺2单元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信