Application of Pre-installed Smart Box-type Substation in Engineering Project Management under the Environment of Internet of things

Hao Wu, H. Yu, Xuexia Wang
{"title":"Application of Pre-installed Smart Box-type Substation in Engineering Project Management under the Environment of Internet of things","authors":"Hao Wu, H. Yu, Xuexia Wang","doi":"10.1109/IAAI51705.2020.9332826","DOIUrl":null,"url":null,"abstract":"In order to improve the progress management of substation project, the application of prefabricated smart box substation in project management under the environment of Internet of things is studied. Based on the analysis of the research status of prefabricated smart box substation project management at home and abroad, combined with the characteristics of substation engineering construction management, the schedule management process is redefined, and the influencing factors of the whole process of substation project implementation progress in the early stage, the early stage and the construction stage are analyzed, and the fuzzy comprehensive evaluation method based on AHP is established The evaluation model of progress management in the whole process of substation construction project is established, the comprehensive quantitative method of schedule management is obtained, and the control countermeasures of substation project schedule management are proposed. And taking the construction of a substation project as an example, the project schedule was compiled, the schedule influencing factors of the various stages of the project were analyzed, and the effectiveness of the power station in the project schedule management work was evaluated, so as to provide future schedule management for similar projects. A basis worthy of reference.","PeriodicalId":232194,"journal":{"name":"2020 IEEE International Conference on Industrial Application of Artificial Intelligence (IAAI)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Industrial Application of Artificial Intelligence (IAAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAAI51705.2020.9332826","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In order to improve the progress management of substation project, the application of prefabricated smart box substation in project management under the environment of Internet of things is studied. Based on the analysis of the research status of prefabricated smart box substation project management at home and abroad, combined with the characteristics of substation engineering construction management, the schedule management process is redefined, and the influencing factors of the whole process of substation project implementation progress in the early stage, the early stage and the construction stage are analyzed, and the fuzzy comprehensive evaluation method based on AHP is established The evaluation model of progress management in the whole process of substation construction project is established, the comprehensive quantitative method of schedule management is obtained, and the control countermeasures of substation project schedule management are proposed. And taking the construction of a substation project as an example, the project schedule was compiled, the schedule influencing factors of the various stages of the project were analyzed, and the effectiveness of the power station in the project schedule management work was evaluated, so as to provide future schedule management for similar projects. A basis worthy of reference.
物联网环境下预装式智能箱式变电站在工程项目管理中的应用
为了提高变电站项目进度管理水平,研究了物联网环境下预制智能箱式变电站在项目管理中的应用。在分析国内外预制智能箱式变电站项目管理研究现状的基础上,结合变电站工程施工管理的特点,重新定义了进度管理流程,分析了变电站项目实施前期、前期和施工阶段全流程进度的影响因素,建立了变电站建设项目全过程进度管理的评价模型,获得了进度管理的综合量化方法,并提出了变电站项目进度管理的控制对策。并以某变电站工程建设为例,编制了项目进度计划,分析了项目各阶段进度影响因素,评价了该电站在项目进度管理工作中的有效性,为今后类似项目的进度管理提供参考。一个值得参考的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书