{"title":"Application of Pre-installed Smart Box-type Substation in Engineering Project Management under the Environment of Internet of things","authors":"Hao Wu, H. Yu, Xuexia Wang","doi":"10.1109/IAAI51705.2020.9332826","DOIUrl":null,"url":null,"abstract":"In order to improve the progress management of substation project, the application of prefabricated smart box substation in project management under the environment of Internet of things is studied. Based on the analysis of the research status of prefabricated smart box substation project management at home and abroad, combined with the characteristics of substation engineering construction management, the schedule management process is redefined, and the influencing factors of the whole process of substation project implementation progress in the early stage, the early stage and the construction stage are analyzed, and the fuzzy comprehensive evaluation method based on AHP is established The evaluation model of progress management in the whole process of substation construction project is established, the comprehensive quantitative method of schedule management is obtained, and the control countermeasures of substation project schedule management are proposed. And taking the construction of a substation project as an example, the project schedule was compiled, the schedule influencing factors of the various stages of the project were analyzed, and the effectiveness of the power station in the project schedule management work was evaluated, so as to provide future schedule management for similar projects. A basis worthy of reference.","PeriodicalId":232194,"journal":{"name":"2020 IEEE International Conference on Industrial Application of Artificial Intelligence (IAAI)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Industrial Application of Artificial Intelligence (IAAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAAI51705.2020.9332826","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In order to improve the progress management of substation project, the application of prefabricated smart box substation in project management under the environment of Internet of things is studied. Based on the analysis of the research status of prefabricated smart box substation project management at home and abroad, combined with the characteristics of substation engineering construction management, the schedule management process is redefined, and the influencing factors of the whole process of substation project implementation progress in the early stage, the early stage and the construction stage are analyzed, and the fuzzy comprehensive evaluation method based on AHP is established The evaluation model of progress management in the whole process of substation construction project is established, the comprehensive quantitative method of schedule management is obtained, and the control countermeasures of substation project schedule management are proposed. And taking the construction of a substation project as an example, the project schedule was compiled, the schedule influencing factors of the various stages of the project were analyzed, and the effectiveness of the power station in the project schedule management work was evaluated, so as to provide future schedule management for similar projects. A basis worthy of reference.