Workshop for Identifying Assembly Time Savings: An OEM Empirical Study

Essam Z. Namouz, J. Summers, Gregory M. Mocko, A. Obieglo
{"title":"Workshop for Identifying Assembly Time Savings: An OEM Empirical Study","authors":"Essam Z. Namouz, J. Summers, Gregory M. Mocko, A. Obieglo","doi":"10.1109/ICMA.2010.55","DOIUrl":null,"url":null,"abstract":"This paper presents the procedure and recommendations resulting from an original equipment manufacturer empirical study on an assembly time savings workshop. The focus of the workshop was to reduce the assembly time of an automotive vehicle by reverse engineering a vehicle currently in production and applying design for assembly guidelines. The workshop was conducted at the OEM’s research and development laboratory in Germany and required a collaborative effort between the US manufacturing plant and the German design group. The organization, equipment needed, and method used to conduct the assembly workshop are discussed in detail. The outcomes of the empirical study include assembly time reductions as well as best practices for conducting a time savings workshop. Specific details about assembly time and time reduction are not included in this paper due to the proprietary nature of the project.","PeriodicalId":233469,"journal":{"name":"2010 International Conference on Manufacturing Automation","volume":"194 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Manufacturing Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMA.2010.55","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper presents the procedure and recommendations resulting from an original equipment manufacturer empirical study on an assembly time savings workshop. The focus of the workshop was to reduce the assembly time of an automotive vehicle by reverse engineering a vehicle currently in production and applying design for assembly guidelines. The workshop was conducted at the OEM’s research and development laboratory in Germany and required a collaborative effort between the US manufacturing plant and the German design group. The organization, equipment needed, and method used to conduct the assembly workshop are discussed in detail. The outcomes of the empirical study include assembly time reductions as well as best practices for conducting a time savings workshop. Specific details about assembly time and time reduction are not included in this paper due to the proprietary nature of the project.
识别组装时间节省工作坊:OEM的实证研究
本文介绍了一个原始设备制造商对节省装配时间车间的实证研究的过程和建议。研讨会的重点是通过对正在生产的车辆进行逆向工程和应用装配指南设计来减少汽车的装配时间。该研讨会是在德国OEM的研发实验室进行的,需要美国制造工厂和德国设计团队之间的合作努力。详细讨论了装配车间的组织、设备和方法。实证研究的结果包括装配时间的减少以及进行时间节约研讨会的最佳实践。由于项目的专有性质,关于装配时间和减少时间的具体细节不包括在本文中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信