Optimization of the Traveling Time of Construction Crews to Minimize the Time to Operation of a Wind Farm

L. Ferrari, G. F. Frate, Francesca Leanza, Gian Lorenzo Giuliattini Burbui
{"title":"Optimization of the Traveling Time of Construction Crews to Minimize the Time to Operation of a Wind Farm","authors":"L. Ferrari, G. F. Frate, Francesca Leanza, Gian Lorenzo Giuliattini Burbui","doi":"10.1115/gt2022-83454","DOIUrl":null,"url":null,"abstract":"\n Building a wind farm is a long and critical process. Many operations have to be arranged in sequence to complete and put in operation a wind farm. Typically, a wind farm is located in an exposed site, with a reduced accessibility and a limited interconnections between machines. The number of crews operating in parallel on the plant is a crucial parameter. By increasing the number of teams, the time to operation decreases but the overall commissioning cost increases. The strategy adopted to schedule the building operations can have an impact on this balance. An optimized sequence may keep the time to operation low but still limiting the number of crews involved. In this study, an optimization procedure based on a genetic algorithm was used for the minimization of the construction time of a wind farm of 200 MW selected as a case study. The problem was solved by considering an approach inspired to the Multiple Travelling Salesman Problem. An increasing number of crews was also considered to find the tradeoff between time and cost. The comparison between the results of the optimization process and those of a more traditional approach showed the benefits of an optimized approach to the problem both in terms of time to operation and costs. In particular, in the case study analyzed, a saving of almost 24% of the erection and installation time (around 280k$) was achieved only by optimizing the routes followed by the construction crews.","PeriodicalId":336848,"journal":{"name":"Volume 11: Wind Energy","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 11: Wind Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/gt2022-83454","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Building a wind farm is a long and critical process. Many operations have to be arranged in sequence to complete and put in operation a wind farm. Typically, a wind farm is located in an exposed site, with a reduced accessibility and a limited interconnections between machines. The number of crews operating in parallel on the plant is a crucial parameter. By increasing the number of teams, the time to operation decreases but the overall commissioning cost increases. The strategy adopted to schedule the building operations can have an impact on this balance. An optimized sequence may keep the time to operation low but still limiting the number of crews involved. In this study, an optimization procedure based on a genetic algorithm was used for the minimization of the construction time of a wind farm of 200 MW selected as a case study. The problem was solved by considering an approach inspired to the Multiple Travelling Salesman Problem. An increasing number of crews was also considered to find the tradeoff between time and cost. The comparison between the results of the optimization process and those of a more traditional approach showed the benefits of an optimized approach to the problem both in terms of time to operation and costs. In particular, in the case study analyzed, a saving of almost 24% of the erection and installation time (around 280k$) was achieved only by optimizing the routes followed by the construction crews.
优化施工人员的出行时间以减少风电场的运行时间
建设风力发电场是一个漫长而关键的过程。许多操作必须按顺序安排,以完成并投入运行一个风电场。通常,风力发电场位于一个暴露的地点,具有较低的可达性和有限的机器之间的互连。同时在核电站工作的机组人员数量是一个关键参数。通过增加团队数量,操作时间减少,但总体调试成本增加。所采用的规划建筑操作的策略会对这种平衡产生影响。优化后的顺序可以缩短操作时间,但仍然限制了参与的人员数量。本文以某200mw风电场为例,采用基于遗传算法的优化程序,对其建设时间进行优化。该问题通过考虑一种受多重旅行商问题启发的方法来解决。越来越多的机组人员也被考虑在时间和成本之间找到平衡。优化过程的结果与传统方法的结果之间的比较表明,优化方法在操作时间和成本方面都具有优势。特别是,在案例分析中,仅通过优化施工人员遵循的路线,就可以节省近24%的安装时间(约28万美元)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书