Design of electrical power supply system in a typical petroleum refinery

Z. Makani, S. Daniel Chowdhury
{"title":"Design of electrical power supply system in a typical petroleum refinery","authors":"Z. Makani, S. Daniel Chowdhury","doi":"10.1109/UPEC.2017.8231942","DOIUrl":null,"url":null,"abstract":"The electrical system shall be designed economically for continuous and reliable services, safely to personnel and equipment, ease of maintenance and operation, minimum power losses, protection of equipment mechanically, interchangeability of equipment and addition of the of the loads. In order to achieve the above goals and obtain the desired results, a scientific study based on different theories and practical experiences will be needed. In this study, the power supply of Transnet Pipeline Terminal 2 (TM2) petroleum refinery in Heidelberg, the criteria and methods of designs of normal networks, electrical equipment and protection of the system will be discussed and investigated. A single line diagram will be presented as the outcome of the design. The single line diagram includes 88kV, 11kV and 400V voltage levels. In the second phase of the design single line diagram is consequently simulated by the ETAP software. The study will cover the following: load flow, short circuit current and motor starting. The intention of this study is to create solution in different ways, electrical loads should be categorized in this energy industry as well as energizing these loads by a stable power supplies. In addition the key role of the short circuit impedance of the transformers in control of the short circuit will be presented. Furthermore the selection procedure of the electrical equipment and accessories including cables, transformers, circuit breaker, relays, and etc. are presented. The following factors such as the size of equipment, losses and voltage drops will be checked by load flow study. A comprehensive study of the short circuit current calculations is implanted and can be observed how the system can be checked by the results of this study. In the dynamic study of the system, the biggest motor starting is simulated and the impacts of the voltage dips due to starting of this motor on the other running motors are shown. Since numerous types of equipment on one hand and the research on the economic matters on the other hand are time consuming, the scope of this report will mainly concentrate on the technical factors and as a results it does not cover the economic aspects. Moreover, high standard engineering in the petroleum industry is essential to design electrical system. It is noted that more economical options are acceptable as long as they end up with the same technical results or better.","PeriodicalId":272049,"journal":{"name":"2017 52nd International Universities Power Engineering Conference (UPEC)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 52nd International Universities Power Engineering Conference (UPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2017.8231942","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The electrical system shall be designed economically for continuous and reliable services, safely to personnel and equipment, ease of maintenance and operation, minimum power losses, protection of equipment mechanically, interchangeability of equipment and addition of the of the loads. In order to achieve the above goals and obtain the desired results, a scientific study based on different theories and practical experiences will be needed. In this study, the power supply of Transnet Pipeline Terminal 2 (TM2) petroleum refinery in Heidelberg, the criteria and methods of designs of normal networks, electrical equipment and protection of the system will be discussed and investigated. A single line diagram will be presented as the outcome of the design. The single line diagram includes 88kV, 11kV and 400V voltage levels. In the second phase of the design single line diagram is consequently simulated by the ETAP software. The study will cover the following: load flow, short circuit current and motor starting. The intention of this study is to create solution in different ways, electrical loads should be categorized in this energy industry as well as energizing these loads by a stable power supplies. In addition the key role of the short circuit impedance of the transformers in control of the short circuit will be presented. Furthermore the selection procedure of the electrical equipment and accessories including cables, transformers, circuit breaker, relays, and etc. are presented. The following factors such as the size of equipment, losses and voltage drops will be checked by load flow study. A comprehensive study of the short circuit current calculations is implanted and can be observed how the system can be checked by the results of this study. In the dynamic study of the system, the biggest motor starting is simulated and the impacts of the voltage dips due to starting of this motor on the other running motors are shown. Since numerous types of equipment on one hand and the research on the economic matters on the other hand are time consuming, the scope of this report will mainly concentrate on the technical factors and as a results it does not cover the economic aspects. Moreover, high standard engineering in the petroleum industry is essential to design electrical system. It is noted that more economical options are acceptable as long as they end up with the same technical results or better.
某典型炼油厂供电系统设计
电气系统的设计应经济实惠,能够连续可靠地服务,对人员和设备安全,易于维护和操作,功率损耗最小,机械地保护设备,设备的互换性和负载的增加。为了达到上述目标并获得预期的结果,需要基于不同理论和实践经验的科学研究。本文以海德堡Transnet Pipeline Terminal 2 (TM2)炼油厂的供电为例,对正常电网、电气设备和系统保护的设计标准和方法进行了探讨和研究。单线图将作为设计的结果呈现。单线图包括88kV、11kV和400V电压等级。在设计的第二阶段,用ETAP软件模拟单线图。该研究将涵盖以下内容:负载流量,短路电流和电机启动。本研究的目的是创造不同的解决方案,在这个能源行业中,电力负荷应该被分类,并通过稳定的电源为这些负荷供电。此外,还介绍了变压器的短路阻抗在控制短路中的关键作用。并介绍了电缆、变压器、断路器、继电器等电气设备及附件的选型过程。以下因素,如设备的大小,损耗和电压降将通过负载流研究进行检查。对短路电流的计算进行了全面的研究,并可以观察到如何通过本研究的结果来检查系统。在系统的动态研究中,模拟了最大的电机启动,并显示了该电机启动时电压下降对其他运行电机的影响。由于一方面设备种类繁多,另一方面对经济问题的研究是费时的,因此本报告的范围将主要集中在技术因素上,因此不包括经济方面。此外,在石油工业中,高标准的工程设计对电气系统的设计至关重要。值得注意的是,更经济的选择是可以接受的,只要它们最终具有相同或更好的技术结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信