Exact method for single vessel and multiple quay cranes to solve scheduling problem at port of Tripoli-Lebanon

A. Skaf, S. Lamrous, Z. Hammoudan, M. Manier
{"title":"Exact method for single vessel and multiple quay cranes to solve scheduling problem at port of Tripoli-Lebanon","authors":"A. Skaf, S. Lamrous, Z. Hammoudan, M. Manier","doi":"10.1109/IEEM.2018.8607546","DOIUrl":null,"url":null,"abstract":"This paper discusses the Quay Crane Scheduling Problem (QCSP) at port of Tripoli-Lebanon, determines the unloading/loading sequences of bays for quay cranes assigned to a single container vessel, provides a mixed integer programming model for the quay crane scheduling problem and proposes a dynamic programming algorithm to solve the QCSP. The objective of this paper is to minimize the completion time of unloading/loading containers and therefore to reduce the docking time of the vessel in the terminal. Finally the results of this paper are compared to the port results.","PeriodicalId":119238,"journal":{"name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2018.8607546","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

This paper discusses the Quay Crane Scheduling Problem (QCSP) at port of Tripoli-Lebanon, determines the unloading/loading sequences of bays for quay cranes assigned to a single container vessel, provides a mixed integer programming model for the quay crane scheduling problem and proposes a dynamic programming algorithm to solve the QCSP. The objective of this paper is to minimize the completion time of unloading/loading containers and therefore to reduce the docking time of the vessel in the terminal. Finally the results of this paper are compared to the port results.
黎波里-黎巴嫩港单船多岸吊调度问题的精确求解方法
讨论了黎波里-黎巴嫩港码头起重机调度问题,确定了单艘集装箱船码头起重机的装卸顺序,给出了码头起重机调度问题的混合整数规划模型,并提出了求解码头起重机调度问题的动态规划算法。本文的目标是最大限度地减少装卸集装箱的完成时间,从而减少船舶在码头的停靠时间。最后将本文的计算结果与实测结果进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信