{"title":"Schedule Control of Alternator Trial Production","authors":"Zhuoya Zhang, Yumin He","doi":"10.1109/ISPCEM52197.2020.00022","DOIUrl":null,"url":null,"abstract":"R&D production is complex and takes relatively a long time. This paper studies production schedule control for R&D production. The case study can provide a reference for similar companies to take schedule control of trail production for R&D.","PeriodicalId":201497,"journal":{"name":"2020 International Signal Processing, Communications and Engineering Management Conference (ISPCEM)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Signal Processing, Communications and Engineering Management Conference (ISPCEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPCEM52197.2020.00022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
R&D production is complex and takes relatively a long time. This paper studies production schedule control for R&D production. The case study can provide a reference for similar companies to take schedule control of trail production for R&D.