Budhigandaki Hydroelectric Project is Unlikely to be Implemented as Recommended by Tractebel Engineering

H. Shrestha
{"title":"Budhigandaki Hydroelectric Project is Unlikely to be Implemented as Recommended by Tractebel Engineering","authors":"H. Shrestha","doi":"10.3126/hn.v17i0.13267","DOIUrl":null,"url":null,"abstract":"Tractebel Engineering SA France has recommended 263 m high double curvature arch dam for the Budhigandaki Hydroelectric Project for generation of 1200 MW. The author, based on findings of the Tractebel’s feasibility study itself, gives reasons why the project is unlikely to be implemented as recommended by the consultant. Further, the author raises the question with the government why this project was declared as one of the projects of national pride and was ready for committing to funding beforehand for the preparation of detail design, tender documents and tender drawings in a single package contract along with the feasibility study when the investment decision could only be taken after ascertaining the soundness/ attractiveness of the project on technical, economical, financial and socio-environmental grounds through feasibility and Environmental Impact Assessment (EIA) studies. The author also believes that the project could become more attractive if the downstream benefits from flow regulation in existing irrigation project in India could be accounted for and two potential hydroelectric projects in Nepal at the downstream reaches could be implemented first to derive additional power benefits in these two projects from flow regulation. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 17, July 2015","PeriodicalId":117617,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-08-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/hn.v17i0.13267","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Tractebel Engineering SA France has recommended 263 m high double curvature arch dam for the Budhigandaki Hydroelectric Project for generation of 1200 MW. The author, based on findings of the Tractebel’s feasibility study itself, gives reasons why the project is unlikely to be implemented as recommended by the consultant. Further, the author raises the question with the government why this project was declared as one of the projects of national pride and was ready for committing to funding beforehand for the preparation of detail design, tender documents and tender drawings in a single package contract along with the feasibility study when the investment decision could only be taken after ascertaining the soundness/ attractiveness of the project on technical, economical, financial and socio-environmental grounds through feasibility and Environmental Impact Assessment (EIA) studies. The author also believes that the project could become more attractive if the downstream benefits from flow regulation in existing irrigation project in India could be accounted for and two potential hydroelectric projects in Nepal at the downstream reaches could be implemented first to derive additional power benefits in these two projects from flow regulation. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 17, July 2015
Budhigandaki水电项目不太可能按照Tractebel Engineering的建议实施
法国Tractebel工程公司为Budhigandaki水电项目推荐了263米高的双曲拱坝,发电量为1200兆瓦。作者根据Tractebel可行性研究本身的结果,给出了该项目不太可能按照顾问建议实施的原因。此外,作者向政府提出了一个问题,为什么这个项目被宣布为民族骄傲的项目之一,并准备在一个单一的一揽子合同中准备详细设计,招标文件和投标图纸,以及可行性研究,而只有在确定了项目的技术,经济和经济的合理性/吸引力之后才能做出投资决定。通过可行性和环境影响评估(EIA)研究,从财政和社会环境方面考虑。作者还认为,如果能够考虑到印度现有灌溉项目的流量调节带来的下游效益,并且可以首先实施尼泊尔下游的两个潜在水电项目,从而在这两个项目中从流量调节中获得额外的电力效益,那么该项目可能会变得更具吸引力。水电尼泊尔杂志水,能源和环境杂志,第17期,2015年7月
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信