Evaluating the perception of structural defects during implementation of RC T-beams

E.S.A. Bayoumi
{"title":"Evaluating the perception of structural defects during implementation of RC T-beams","authors":"E.S.A. Bayoumi","doi":"10.24853/ijcei.2.1.41-56","DOIUrl":null,"url":null,"abstract":"Most defects during construction projects are due to human errors which happen due to poor workmanship. This study involved 8 simply supported RC T-beams subjected to uniformly distributed load at both-edges of slab. The investigated parameters were the effect of malposition of slab reinforcement, unequal configuration of slab reinforcement and change in bar diameter of slab reinforcement. The experimental results showed that; malposition of slab reinforcement leads to a lower load carrying capacity of the slab and consequently flexural resistance decreased and slab deflection increased. The irregularity of the reinforcing bars in concrete slab affected the load carrying capacity of T-beam. Well-arranged distribution of reinforcement improves the ductile behavior of slab and reduced value of deflections at failure. Using reinforcing steel bars with diameters higher than 8mm in the reinforcement helped the slab to withstand more loads. The use of 10mm diameter in reinforcement of the slab enhances the serviceability of T-beams.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"221 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Civil Engineering and Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24853/ijcei.2.1.41-56","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Most defects during construction projects are due to human errors which happen due to poor workmanship. This study involved 8 simply supported RC T-beams subjected to uniformly distributed load at both-edges of slab. The investigated parameters were the effect of malposition of slab reinforcement, unequal configuration of slab reinforcement and change in bar diameter of slab reinforcement. The experimental results showed that; malposition of slab reinforcement leads to a lower load carrying capacity of the slab and consequently flexural resistance decreased and slab deflection increased. The irregularity of the reinforcing bars in concrete slab affected the load carrying capacity of T-beam. Well-arranged distribution of reinforcement improves the ductile behavior of slab and reduced value of deflections at failure. Using reinforcing steel bars with diameters higher than 8mm in the reinforcement helped the slab to withstand more loads. The use of 10mm diameter in reinforcement of the slab enhances the serviceability of T-beams.
钢筋混凝土t梁施工过程中结构缺陷感知评估
建筑工程中的大多数缺陷都是由于人为错误造成的,而人为错误是由于做工不佳造成的。本研究涉及8根简支型钢筋混凝土t梁,在楼板两侧均布荷载作用下。研究了板坯配筋错位、板坯配筋不均匀配置和板坯配筋直径变化的影响。实验结果表明:;楼板配筋错位导致楼板承载力降低,从而导致楼板抗弯阻力降低,楼板挠度增大。混凝土板内钢筋的不均匀性影响了t梁的承载能力。配筋的合理分布改善了板的延性,降低了破坏时的挠度值。在配筋中使用直径大于8mm的钢筋有助于板承受更大的载荷。采用直径10mm的钢板加固,提高了t型梁的使用性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信