Sensitivity analysis of optimal transmission capacity reservation for cross-border exchange of reserve capacity in Northern Europe

Y. Gebrekiros, G. Doorman, S. Jaehnert
{"title":"Sensitivity analysis of optimal transmission capacity reservation for cross-border exchange of reserve capacity in Northern Europe","authors":"Y. Gebrekiros, G. Doorman, S. Jaehnert","doi":"10.1109/EEM.2014.6861277","DOIUrl":null,"url":null,"abstract":"This paper discusses the impact of Nordic hydro inflow and change in planning period on total costs, optimal transmission capacity reservation, and country wise reserve procurement. The model is intended for the Northern European system including the day-ahead and reserve markets. The main impact of the inflow variation in the Nordic system is on the total costs. The effect of inflow variation on optimal transmission capacity reservation is not significant. Similarly, the main impact of the distinct peak and off-peak period reserve procurement is the flexibility a generating unit gets with shorter planning periods which subsequently results in lower costs. For the case with peak and off-peak distinction, Optimal transmission capacity reservation values in a given day are different whereas the pattern does not change for the whole year. The volume of upward and downward reserves procured was consistent irrespective of the Nordic inflow variation or the shortening of the planning period for reserve procurement.","PeriodicalId":261127,"journal":{"name":"11th International Conference on the European Energy Market (EEM14)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on the European Energy Market (EEM14)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2014.6861277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper discusses the impact of Nordic hydro inflow and change in planning period on total costs, optimal transmission capacity reservation, and country wise reserve procurement. The model is intended for the Northern European system including the day-ahead and reserve markets. The main impact of the inflow variation in the Nordic system is on the total costs. The effect of inflow variation on optimal transmission capacity reservation is not significant. Similarly, the main impact of the distinct peak and off-peak period reserve procurement is the flexibility a generating unit gets with shorter planning periods which subsequently results in lower costs. For the case with peak and off-peak distinction, Optimal transmission capacity reservation values in a given day are different whereas the pattern does not change for the whole year. The volume of upward and downward reserves procured was consistent irrespective of the Nordic inflow variation or the shortening of the planning period for reserve procurement.
北欧备用容量跨境交换最优输电容量预留的敏感性分析
本文讨论了北欧水电流入和规划期变化对总成本、最优输电容量预留和国家储备采购的影响。该模型适用于北欧系统,包括日前和储备市场。北欧系统中流入变化的主要影响在于总成本。入流变化对最优输电容量保留的影响不显著。同样,不同的高峰和非高峰时期储备采购的主要影响是发电机组在较短的规划期间获得的灵活性,从而导致较低的成本。在有峰、非峰区分的情况下,某一天的最优输电容量预留值不同,而全年的模式不变。无论北欧流入的变化或储备采购规划期的缩短,采购的向上和向下储备的数量是一致的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信