Regulation

M. Dixon
{"title":"Regulation","authors":"M. Dixon","doi":"10.1142/9789811201066_others03","DOIUrl":null,"url":null,"abstract":"Country: Taiwan, Province Of China [1] EIA Law: Environmental Impact Assessment Act, 1994 Law Link: Link [2] EIA Regulations: Environmental Impact Assessment Enforcement Rules Regulations Link: Link [3] Projects Requiring EIA: Government projects Private Projects Abridged Assessments: Yes Assessment Detail: Developer shall prepare a \"phase I\" environmental impact study and submit it to the competent authority. The authority has 50 days to complete a review (may be extended by 50 days) and notify the developer if a \"phase II\" assessment must be prepared. A phase II assessment is required if there is concern about significant impact on the environment. EIA Act, Arts. 6, 7, 8 Best Practices in Lieu of EIA: No Who Conducts Screening: Government Who Conducts Screening Detail: EIA Act, Arts. 7 & 8 Criteria for Screening: List or appendix of project or activity types Proposed project or activity may cause significant environmental impact Criteria for Screening Detail: EIA Act, Arts. 5 & 8 (list of activities for Phase I assessment; \"significant impact\" standard for Phase II assessment). \"Significant impact\" is further defined in the EIA Enforcement Regulations, Art. 19 Who Prepares EIA: Project Proponent (with or without contractor) EIA Contractor Qualifications: Yes Conflict of Interest: No Terms of Reference: No Days for Decision Maker Review: 60 (may be extended) Automatic Approval: No Written Decision: Yes Written Decision Detail: \"After authorization by the competent authority of the environmental impact assessment report in the foregoing paragraph, the environmental impact assessment report and a summary of the review conclusion shall be officially announced and published in the official register of the competent authority.\" EIA Act, Art. 13. Permission granted prior to completion of review or authorization of an EIA report shall be invalid. EIA Act, Art. 14. Authority to Impose Conditions: Yes Authority to Impose Conditions Details: There appears to be authority to impose conditions. See EIA Enforcement Rules, Art. 43. Expiry of Decision: 3 years Expiry of Decision Detail: \"When a developer starts development activity more than three years after the approval of its environmental impact statement or environmental impact assessment report and the acquisition of development activity permission granted by the industry competent authority, the developer shall submit an analysis of the difference between current environmental conditions and environmental conditions at the time its development activity permission was granted and a strategy evaluation report to the competent authority for review. Development activity may not start prior to the completion of the review by the competent authority.\" EIA Act, Art. 16-1 Interdisciplinary Team: No Range of Alternatives: Yes Range of Alternatives Detail: The EIA report must contain \"alternate plan\" [sic] EIA Act, Art. 11(IX) No Action Alternative: No No Action Alternative Detail: Not mentioned in the EIA Act provision concerning content of draft EIA report. See EIA Act, Art. 11. Type(s) of Impact Analysis: Direct environmental impacts Social impacts Health impacts Mitigation: Yes Mitigation Detail: The EIA shall contain \"[a] summary chart of strategies for the prevention and mitigation of the","PeriodicalId":188340,"journal":{"name":"Privacy in the Age of Neuroscience","volume":"112 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Privacy in the Age of Neuroscience","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/9789811201066_others03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Country: Taiwan, Province Of China [1] EIA Law: Environmental Impact Assessment Act, 1994 Law Link: Link [2] EIA Regulations: Environmental Impact Assessment Enforcement Rules Regulations Link: Link [3] Projects Requiring EIA: Government projects Private Projects Abridged Assessments: Yes Assessment Detail: Developer shall prepare a "phase I" environmental impact study and submit it to the competent authority. The authority has 50 days to complete a review (may be extended by 50 days) and notify the developer if a "phase II" assessment must be prepared. A phase II assessment is required if there is concern about significant impact on the environment. EIA Act, Arts. 6, 7, 8 Best Practices in Lieu of EIA: No Who Conducts Screening: Government Who Conducts Screening Detail: EIA Act, Arts. 7 & 8 Criteria for Screening: List or appendix of project or activity types Proposed project or activity may cause significant environmental impact Criteria for Screening Detail: EIA Act, Arts. 5 & 8 (list of activities for Phase I assessment; "significant impact" standard for Phase II assessment). "Significant impact" is further defined in the EIA Enforcement Regulations, Art. 19 Who Prepares EIA: Project Proponent (with or without contractor) EIA Contractor Qualifications: Yes Conflict of Interest: No Terms of Reference: No Days for Decision Maker Review: 60 (may be extended) Automatic Approval: No Written Decision: Yes Written Decision Detail: "After authorization by the competent authority of the environmental impact assessment report in the foregoing paragraph, the environmental impact assessment report and a summary of the review conclusion shall be officially announced and published in the official register of the competent authority." EIA Act, Art. 13. Permission granted prior to completion of review or authorization of an EIA report shall be invalid. EIA Act, Art. 14. Authority to Impose Conditions: Yes Authority to Impose Conditions Details: There appears to be authority to impose conditions. See EIA Enforcement Rules, Art. 43. Expiry of Decision: 3 years Expiry of Decision Detail: "When a developer starts development activity more than three years after the approval of its environmental impact statement or environmental impact assessment report and the acquisition of development activity permission granted by the industry competent authority, the developer shall submit an analysis of the difference between current environmental conditions and environmental conditions at the time its development activity permission was granted and a strategy evaluation report to the competent authority for review. Development activity may not start prior to the completion of the review by the competent authority." EIA Act, Art. 16-1 Interdisciplinary Team: No Range of Alternatives: Yes Range of Alternatives Detail: The EIA report must contain "alternate plan" [sic] EIA Act, Art. 11(IX) No Action Alternative: No No Action Alternative Detail: Not mentioned in the EIA Act provision concerning content of draft EIA report. See EIA Act, Art. 11. Type(s) of Impact Analysis: Direct environmental impacts Social impacts Health impacts Mitigation: Yes Mitigation Detail: The EIA shall contain "[a] summary chart of strategies for the prevention and mitigation of the
监管
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信