{"title":"A Pseudo-Deadline Based O(1) proportional share scheduler for embedded systems","authors":"Swarnendu Ray, A. Sarkar","doi":"10.1109/ISVDAT.2014.6881083","DOIUrl":null,"url":null,"abstract":"This paper presents Pseudo-Deadline Based Round-Robin (PDBRR), an O(1) proportional share scheduler for Embedded Systems that execute a mix of jobs with varying timeliness priorities. Simulation based experimental results reveal that PDBRR is able to achieve high proportional share scheduling accuracy.","PeriodicalId":217280,"journal":{"name":"18th International Symposium on VLSI Design and Test","volume":"374 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"18th International Symposium on VLSI Design and Test","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISVDAT.2014.6881083","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper presents Pseudo-Deadline Based Round-Robin (PDBRR), an O(1) proportional share scheduler for Embedded Systems that execute a mix of jobs with varying timeliness priorities. Simulation based experimental results reveal that PDBRR is able to achieve high proportional share scheduling accuracy.