The effect of including power converter losses when modelling energy storage systems: A UK domestic study

Konstantina Panagiotou, C. Klumpner, M. Sumner
{"title":"The effect of including power converter losses when modelling energy storage systems: A UK domestic study","authors":"Konstantina Panagiotou, C. Klumpner, M. Sumner","doi":"10.1109/EPE.2016.7695584","DOIUrl":null,"url":null,"abstract":"Energy storage systems (ESS) are seen as an increasingly important technology for managing electrical distribution systems, and there is now much research into both the underlying technologies of these systems, and their “optimum” management especially for applications within a single household. Optimum management usually depends on many factors and assumptions, for example what should be optimized (self-consumption of local renewable resources, consumer cost, peak reduction), prediction of local generation and load patterns, and the assumptions concerning the operation of the ESS itself. This paper aims to quantify one of the usual assumptions made (especially by non-electrical engineers) i.e. that the assumption that the power converter in the ESS is 100% efficient does not lead to substantial errors in the ESS performance and cost-benefit analysis. Three different ESS power converter models have been created and their behaviour as part of a house based ESS management system over a one year period has been analysed using five different control approaches, a variety of battery and solar panel sizes and employing a time of use tariff (Economy 7). By observing the ESS charging pattern through the year and monitoring of the annual electricity cost along with the system's losses for the household, relationships between the battery and PV size, the control algorithms, the electricity cost and the system losses were created.","PeriodicalId":119358,"journal":{"name":"2016 18th European Conference on Power Electronics and Applications (EPE'16 ECCE Europe)","volume":"423 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 18th European Conference on Power Electronics and Applications (EPE'16 ECCE Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPE.2016.7695584","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

Energy storage systems (ESS) are seen as an increasingly important technology for managing electrical distribution systems, and there is now much research into both the underlying technologies of these systems, and their “optimum” management especially for applications within a single household. Optimum management usually depends on many factors and assumptions, for example what should be optimized (self-consumption of local renewable resources, consumer cost, peak reduction), prediction of local generation and load patterns, and the assumptions concerning the operation of the ESS itself. This paper aims to quantify one of the usual assumptions made (especially by non-electrical engineers) i.e. that the assumption that the power converter in the ESS is 100% efficient does not lead to substantial errors in the ESS performance and cost-benefit analysis. Three different ESS power converter models have been created and their behaviour as part of a house based ESS management system over a one year period has been analysed using five different control approaches, a variety of battery and solar panel sizes and employing a time of use tariff (Economy 7). By observing the ESS charging pattern through the year and monitoring of the annual electricity cost along with the system's losses for the household, relationships between the battery and PV size, the control algorithms, the electricity cost and the system losses were created.
在建立储能系统模型时,包括功率转换器损耗的影响:一项英国国内研究
储能系统(ESS)被视为管理配电系统的一项日益重要的技术,目前对这些系统的基础技术及其“最佳”管理(特别是在单个家庭中的应用)进行了大量研究。最佳管理通常取决于许多因素和假设,例如应该优化什么(当地可再生资源的自我消耗、消费者成本、峰值减少)、当地发电和负荷模式的预测,以及有关ESS本身运行的假设。本文旨在量化一个通常的假设(特别是由非电气工程师),即假设ESS中的功率转换器100%有效,不会导致ESS性能和成本效益分析中的重大错误。创建了三个不同的ESS电源转换器模型和基于他们的行为作为房子的一部分ESS管理系统在一年时间内一直使用五种不同的控制方法,分析各种电池和太阳能板的大小和使用时间使用关税(经济7)。通过观察ESS充电模式,监控年度电力成本以及系统为家庭的损失,电池和光伏大小之间的关系,建立了控制算法、电力成本和系统损耗。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信