{"title":"CATCHMENT MANAGEMENT PLANNING ADDS VALUE TO THE ENVIRONMENT AGENCY OF ENGLAND AND WALES","authors":"A. Hepworth","doi":"10.1080/10183469.1997.9631402","DOIUrl":null,"url":null,"abstract":"Summary This paper aims to show how the Catchment Management Planning (CMP) process is adding value to the Environment Agency through actions in the environment. Examples of these actions are described. The process of producing CMPs is described. Finally, the move from the National Rivers Authority or NRA to the Environment Agency and how these changes will affect the plan process.","PeriodicalId":161337,"journal":{"name":"Southern African Journal of Aquatic Sciences","volume":"120 10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Southern African Journal of Aquatic Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10183469.1997.9631402","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Summary This paper aims to show how the Catchment Management Planning (CMP) process is adding value to the Environment Agency through actions in the environment. Examples of these actions are described. The process of producing CMPs is described. Finally, the move from the National Rivers Authority or NRA to the Environment Agency and how these changes will affect the plan process.