Fuzzy resource allocations in project management when insufficient resources are considered

C. Fu, H. Wang
{"title":"Fuzzy resource allocations in project management when insufficient resources are considered","authors":"C. Fu, H. Wang","doi":"10.1109/AFSS.1996.583615","DOIUrl":null,"url":null,"abstract":"This study proposes a fuzzy resource allocation model for project management in which a fuzzy relation on resource needs and a budget limit are described. The model can be solved in the form of crisp linear programming (LP) with /spl alpha/-cut. Despite the delivery routes of the teams, the results can express whether the project has sufficient or insufficient resources resulting from each activity.","PeriodicalId":197019,"journal":{"name":"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Soft Computing in Intelligent Systems and Information Processing. Proceedings of the 1996 Asian Fuzzy Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AFSS.1996.583615","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

This study proposes a fuzzy resource allocation model for project management in which a fuzzy relation on resource needs and a budget limit are described. The model can be solved in the form of crisp linear programming (LP) with /spl alpha/-cut. Despite the delivery routes of the teams, the results can express whether the project has sufficient or insufficient resources resulting from each activity.
考虑资源不足时项目管理中的模糊资源分配
本文提出了一个用于项目管理的模糊资源分配模型,该模型描述了资源需求和预算限制之间的模糊关系。该模型可以用/spl alpha/-cut的清晰线性规划(LP)形式求解。不管团队的交付路线如何,结果都可以表示项目是否有足够的或不足的资源来自于每个活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信