Solving a multi-criteria group scheduling problem for a cellular manufacturing system by scatter search

Y. Gholipour-Kanani, R. Tavakkoli-Moghaddam, A. Khorrami
{"title":"Solving a multi-criteria group scheduling problem for a cellular manufacturing system by scatter search","authors":"Y. Gholipour-Kanani, R. Tavakkoli-Moghaddam, A. Khorrami","doi":"10.1080/10170669.2010.549663","DOIUrl":null,"url":null,"abstract":"This article presents a group scheduling problem for manufacturing cells, in which parts may visit different cells. By addressing intra-cell scheduling, the sequence of parts within manufacturing cells is determined; however, in inter-cell scheduling, the sequence of cells is obtained. A novel mathematical model is presented for a multi-criteria group scheduling problem in a cellular manufacturing system with respect to a design objective function minimizing the makespan and costs of intra-cell movement, tardiness, and sequence-dependent setup, simultaneously. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditional approaches and optimization tools is extremely difficult. Thus, we develop a meta-heuristic algorithm based on scatter search (SS) to solve the foregoing model. The related results confirm the efficiency and effectiveness of our proposed SS algorithm, which finds good solutions, especially for medium- and large-sized problems.","PeriodicalId":369256,"journal":{"name":"Journal of The Chinese Institute of Industrial Engineers","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-03-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of The Chinese Institute of Industrial Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10170669.2010.549663","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

This article presents a group scheduling problem for manufacturing cells, in which parts may visit different cells. By addressing intra-cell scheduling, the sequence of parts within manufacturing cells is determined; however, in inter-cell scheduling, the sequence of cells is obtained. A novel mathematical model is presented for a multi-criteria group scheduling problem in a cellular manufacturing system with respect to a design objective function minimizing the makespan and costs of intra-cell movement, tardiness, and sequence-dependent setup, simultaneously. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditional approaches and optimization tools is extremely difficult. Thus, we develop a meta-heuristic algorithm based on scatter search (SS) to solve the foregoing model. The related results confirm the efficiency and effectiveness of our proposed SS algorithm, which finds good solutions, especially for medium- and large-sized problems.
用分散搜索方法求解元胞制造系统的多准则群调度问题
本文提出了一个零件可能访问不同生产单元的制造单元群调度问题。通过解决单元内调度问题,确定了制造单元内零件的顺序;然而,在细胞间调度中,得到的是细胞的序列。针对细胞制造系统中的多准则群调度问题,提出了一种新的数学模型,该模型考虑了同时最小化最大完工时间和细胞内移动、延迟和序列相关设置成本的设计目标函数。使用传统的方法和优化工具在合理的计算时间内获得这类复杂、大规模问题的最优解是极其困难的。因此,我们开发了一种基于散点搜索(SS)的元启发式算法来解决上述模型。相关结果证实了我们提出的SS算法的效率和有效性,它找到了很好的解决方案,特别是对于大中型问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信