S. Ngoh, T. Chua, T. Cai, K. Ravi, B. K. Tan, Xinlin Lin, Boon Yang Martin Choo, Wei Qing Lee
{"title":"Implementing Real-time Scheduling System for a Precision Engineering Company in Singapore","authors":"S. Ngoh, T. Chua, T. Cai, K. Ravi, B. K. Tan, Xinlin Lin, Boon Yang Martin Choo, Wei Qing Lee","doi":"10.1109/IEEM45057.2020.9309802","DOIUrl":null,"url":null,"abstract":"A good Advanced Planning and Scheduling (APS) system APS helps to improve the order fulfilment process by providing real-time delivery commitment to customer order. However, the implementation of which can be difficult as it involves a great deal of business process improvement effort, which may involve some cleaning up of existing data, evaluation of the current work order tracking practices, re-evaluating bills of material and more. Such processes must take into account operational scenarios that are difficult to model and capture in a theoretical research paper, but are key to implementing an APS system. This paper deals with the challenges of real-world operational challenges of implementing an APS system and the software features, business improvements and operational workflow changes required to overcome these challenges for productivity gain.","PeriodicalId":226426,"journal":{"name":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM45057.2020.9309802","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A good Advanced Planning and Scheduling (APS) system APS helps to improve the order fulfilment process by providing real-time delivery commitment to customer order. However, the implementation of which can be difficult as it involves a great deal of business process improvement effort, which may involve some cleaning up of existing data, evaluation of the current work order tracking practices, re-evaluating bills of material and more. Such processes must take into account operational scenarios that are difficult to model and capture in a theoretical research paper, but are key to implementing an APS system. This paper deals with the challenges of real-world operational challenges of implementing an APS system and the software features, business improvements and operational workflow changes required to overcome these challenges for productivity gain.