{"title":"Summary of Application of Fuzzy Mathematics in Construction Project Management","authors":"Dongyou Tong, Yueming Wang","doi":"10.4236/wjet.2021.93028","DOIUrl":null,"url":null,"abstract":"Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively manage construction projects is the focus of construction project development under the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy mathematical method was difficult to adapt to the current complex and changeable construction projects. Combining fuzzy mathematics with other management methods and computer applications can better simplify complex things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research; selection of optimization schemes and risk assessment, etc. All have a good effect, and can better deal with possible or uncertain things and emergencies in the process of project management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.","PeriodicalId":344331,"journal":{"name":"World Journal of Engineering and Technology","volume":"103 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/wjet.2021.93028","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively manage construction projects is the focus of construction project development under the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy mathematical method was difficult to adapt to the current complex and changeable construction projects. Combining fuzzy mathematics with other management methods and computer applications can better simplify complex things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research; selection of optimization schemes and risk assessment, etc. All have a good effect, and can better deal with possible or uncertain things and emergencies in the process of project management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.