Temporary Ground Fault Path Clearing system for power distribution system

J. Sutanto, P. Pujihatma, R. E. Widjaja
{"title":"Temporary Ground Fault Path Clearing system for power distribution system","authors":"J. Sutanto, P. Pujihatma, R. E. Widjaja","doi":"10.1109/ICPERE.2012.6287220","DOIUrl":null,"url":null,"abstract":"This paper presents an alternative method to improve the reliability of power distribution system against temporary ground fault by means of a recloser inserted between neutral point of substation power transformer and the grounding resistor. This recloser trips when there is ground fault at the feeder and reclose on a preset time delay. If the fault is sustaining, the grounding recloser will close permanently and the traditional overcurrent protection takes place. The field trial confirmed the effectiveness of the proposed method. The method is named as Ground Fault Path Clearing system or GFPC for short.","PeriodicalId":303729,"journal":{"name":"2012 International Conference on Power Engineering and Renewable Energy (ICPERE)","volume":"335 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on Power Engineering and Renewable Energy (ICPERE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPERE.2012.6287220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents an alternative method to improve the reliability of power distribution system against temporary ground fault by means of a recloser inserted between neutral point of substation power transformer and the grounding resistor. This recloser trips when there is ground fault at the feeder and reclose on a preset time delay. If the fault is sustaining, the grounding recloser will close permanently and the traditional overcurrent protection takes place. The field trial confirmed the effectiveness of the proposed method. The method is named as Ground Fault Path Clearing system or GFPC for short.
配电系统临时接地故障路径清除系统
本文提出了在变电站电力变压器中性点与接地电阻之间加装重合闸以提高配电系统抗临时接地故障可靠性的一种替代方法。当馈线接地故障时,该重合闸跳闸,并在预设的时间延迟上重合闸。如果故障持续,接地重合闸将永久关闭,并进行传统的过流保护。现场试验证实了该方法的有效性。该方法被称为接地故障路径清除系统或简称GFPC。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信