Constructed inshore zones as river corridors through urban areas—The Danube in Vienna: preliminary results
A. Chovanec, F. Schiemer, A. Cabela, S. Gressler, C. Grötzer, K. Pascher, R. Raab, H. Teufl, R. Wimmer
{"title":"Constructed inshore zones as river corridors through urban areas—The Danube in Vienna: preliminary results","authors":"A. Chovanec, F. Schiemer, A. Cabela, S. Gressler, C. Grötzer, K. Pascher, R. Raab, H. Teufl, R. Wimmer","doi":"10.1002/(SICI)1099-1646(200003/04)16:2<175::AID-RRR578>3.0.CO;2-C","DOIUrl":null,"url":null,"abstract":"Over the last 125 years, river regulation has considerably changed the ecological conditions of the Austrian Danube and its floodplains such that the system is now very fragmented. Within the municipal area of Vienna, these changes have been particularly severe: river embankments and a bypass channel (the ‘New Danube’), separated from the main river by an artificial island (‘Danube Island’), are the key elements of flood control, and river levels are controlled by the Vienna hydroelectric power plant (‘Freudenau’). During construction of the hydroelectric power plant, the previously straight shoreline of the 21-km long Danube island, with its steep embankments, was restructured by creating shallow water areas, gravel banks, small permanent backwaters and temporary waters. This paper describes the scheme and the results from the first year of a 4-year monitoring programme (‘Danube Island Monitoring Programme’, DIMP) investigating the colonization and successional processes of these areas by monitoring relevant indicator groups (vegetation, dragonflies, amphibians, reptiles, waterfowl). Copyright © 2000 John Wiley & Sons, Ltd.","PeriodicalId":306887,"journal":{"name":"Regulated Rivers-research & Management","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"23","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Regulated Rivers-research & Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/(SICI)1099-1646(200003/04)16:2<175::AID-RRR578>3.0.CO;2-C","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 23
Abstract
Over the last 125 years, river regulation has considerably changed the ecological conditions of the Austrian Danube and its floodplains such that the system is now very fragmented. Within the municipal area of Vienna, these changes have been particularly severe: river embankments and a bypass channel (the ‘New Danube’), separated from the main river by an artificial island (‘Danube Island’), are the key elements of flood control, and river levels are controlled by the Vienna hydroelectric power plant (‘Freudenau’). During construction of the hydroelectric power plant, the previously straight shoreline of the 21-km long Danube island, with its steep embankments, was restructured by creating shallow water areas, gravel banks, small permanent backwaters and temporary waters. This paper describes the scheme and the results from the first year of a 4-year monitoring programme (‘Danube Island Monitoring Programme’, DIMP) investigating the colonization and successional processes of these areas by monitoring relevant indicator groups (vegetation, dragonflies, amphibians, reptiles, waterfowl). Copyright © 2000 John Wiley & Sons, Ltd.
建造近岸地带作为穿过城市地区的河流走廊——维也纳的多瑙河:初步结果
在过去的125年里,河流管理极大地改变了奥地利多瑙河及其洪泛平原的生态条件,使得该系统现在非常分散。在维也纳市区,这些变化尤其严重:河流堤防和旁路通道(“新多瑙河”),与主河由人工岛(“多瑙河岛”)分开,是洪水控制的关键要素,河流水位由维也纳水力发电厂(“弗罗伊德瑙”)控制。在水电站的建设过程中,21公里长的多瑙河岛之前笔直的海岸线,其陡峭的堤防,通过创建浅水区,砾石滩,小型永久回水和临时水域进行了重组。本文描述了一项为期四年的监测计划(“多瑙河岛监测计划”,DIMP)的方案和第一年的结果,该计划通过监测相关指标组(植被、蜻蜓、两栖动物、爬行动物、水禽)来调查这些地区的定植和演代过程。版权所有©2000约翰威利父子有限公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。