Interface test adapter development & maintenance using a Continuity/Insulation Automatic Test Station in large scale test systems

Randall Lemon, Bruce Coulter, Steve Archibald, Chau Nguyen
{"title":"Interface test adapter development & maintenance using a Continuity/Insulation Automatic Test Station in large scale test systems","authors":"Randall Lemon, Bruce Coulter, Steve Archibald, Chau Nguyen","doi":"10.1109/AUTEST.2009.5314017","DOIUrl":null,"url":null,"abstract":"This abstract focuses on four key points with using the Continuity/Insulation Automatic Test Station (Cont/Insul ATE) set in a large scale system: (1) Setup of Cont/Insul ATE and software development for the Cont/Insul ATE; (2) Using the Cont/Insul ATE in prototype development; (3) Verification that multiple copies of Interface Test Adapters (ITAs) will be identical and wired correctly; and (4) Maintenance and repair of ITAs after delivery. A large scale system is defined as a system with multiple test stations at multiple locations and with multiple identical ITAs. This paper will review the advantages and disadvantages of a Cont/Insul ATE test station using cost and schedule impact during the various phases of designing new ITAs and maintaining the ITAs once they have been fielded. The Ground Minuteman Automatic Test System (GMATS) re-host project, completed by the 309th Software Maintenance Group (SMXG) at the Ogden Air Logistics Center (OO-ALC), will be used in this document as a test case. The GMATS project fielded 18 test stations at 8 separate locations, 332 total ITAs with 39 unique configurations. The ITA development work involved building 39 prototype ITAs, verifying the prototype ITAs against their master wire lists, running it through a series of self-tests, integrating the prototype ITAs with the Test Program Set (TPS), building production ITAs and then verifying each production ITA was built correctly. A successful program, such as GMATS, demonstrates that having an asset such as a Cont/Insul ATE test station can dramatically improve on-time deliverables and lower costs to the end customers.","PeriodicalId":187421,"journal":{"name":"2009 IEEE AUTOTESTCON","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE AUTOTESTCON","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.2009.5314017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This abstract focuses on four key points with using the Continuity/Insulation Automatic Test Station (Cont/Insul ATE) set in a large scale system: (1) Setup of Cont/Insul ATE and software development for the Cont/Insul ATE; (2) Using the Cont/Insul ATE in prototype development; (3) Verification that multiple copies of Interface Test Adapters (ITAs) will be identical and wired correctly; and (4) Maintenance and repair of ITAs after delivery. A large scale system is defined as a system with multiple test stations at multiple locations and with multiple identical ITAs. This paper will review the advantages and disadvantages of a Cont/Insul ATE test station using cost and schedule impact during the various phases of designing new ITAs and maintaining the ITAs once they have been fielded. The Ground Minuteman Automatic Test System (GMATS) re-host project, completed by the 309th Software Maintenance Group (SMXG) at the Ogden Air Logistics Center (OO-ALC), will be used in this document as a test case. The GMATS project fielded 18 test stations at 8 separate locations, 332 total ITAs with 39 unique configurations. The ITA development work involved building 39 prototype ITAs, verifying the prototype ITAs against their master wire lists, running it through a series of self-tests, integrating the prototype ITAs with the Test Program Set (TPS), building production ITAs and then verifying each production ITA was built correctly. A successful program, such as GMATS, demonstrates that having an asset such as a Cont/Insul ATE test station can dramatically improve on-time deliverables and lower costs to the end customers.
在大型测试系统中使用连续/绝缘自动测试站开发和维护接口测试适配器
摘要介绍了连续/绝缘自动测试仪(Cont/Insul ATE)在大型连续/绝缘自动测试仪中使用的四个关键问题:(1)Cont/Insul自动测试仪的设置和软件开发;(2)在原型开发中使用Cont/ insulate;(3)确认多个接口测试适配器(ita)的副本是相同的,并且连接正确;(4) ita交付后的维护和维修。大规模系统被定义为在多个地点具有多个测试站和多个相同的ita的系统。本文将回顾在设计新ita和维护ita的各个阶段中使用成本和进度影响的连续/绝缘ATE测试站的优点和缺点。地面民兵自动测试系统(GMATS)重新托管项目由奥格登航空物流中心(OO-ALC)的第309软件维护组(SMXG)完成,将在本文档中用作测试用例。GMATS项目在8个不同的地点部署了18个试验站,共有332个ita,具有39种独特的配置。ITA开发工作包括构建39个原型ITA,根据它们的主接线列表验证原型ITA,通过一系列自测运行它,将原型ITA与测试程序集(TPS)集成,构建生产ITA,然后验证每个生产ITA都被正确构建。一个成功的项目,例如GMATS,证明了拥有一个像Cont/Insul ATE测试站这样的资产可以显著地提高准时交付,并降低最终客户的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信