Penerapan Algoritma C4.5 Untuk Memprediksi Keuntungan Pada PT SMOE Indonesia

Tukino Tukino
{"title":"Penerapan Algoritma C4.5 Untuk Memprediksi Keuntungan Pada PT SMOE Indonesia","authors":"Tukino Tukino","doi":"10.21456/VOL9ISS1PP39-46","DOIUrl":null,"url":null,"abstract":"In the construction project activities, planning is used as a reference for job implementers and becomes the standard of project implementation, including: documents, technical specifications, schedule and budget. Inappropriate planning, inaccurate project realization investigations, inadequate project management skills and lack of professional service providers, are closely related to the outcome of a construction project process. PT SMOE Indonesia which is a company engaged in construction consulting services. At the present time PT SMOE Indonesia has done many construction planning projects both from government and private, this research will discuss how data mining with algorithm C4.5 process data from budget plan consultant planner cost to predict company profit. Data mining is a technique for extracting new information from piles or data warehouses, as we know information is seen as something that is very important and valuable because by mastering information it is easy to achieve a desired goal, this makes everyone race to while C4.5 algorithm is one of induction algorithm of decision tree that is ID3 (Iterative Dichotomiser 3). ID3 was developed by J. Ross Quinlan. In the ID3 algorithm procedure, the inputs are training samples, training labels and attributes. which will illustrate the profit prediction, the results of this study will result in the rules of profit and loss decisions company.","PeriodicalId":123899,"journal":{"name":"Jurnal Sistem Informasi Bisnis","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sistem Informasi Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21456/VOL9ISS1PP39-46","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

In the construction project activities, planning is used as a reference for job implementers and becomes the standard of project implementation, including: documents, technical specifications, schedule and budget. Inappropriate planning, inaccurate project realization investigations, inadequate project management skills and lack of professional service providers, are closely related to the outcome of a construction project process. PT SMOE Indonesia which is a company engaged in construction consulting services. At the present time PT SMOE Indonesia has done many construction planning projects both from government and private, this research will discuss how data mining with algorithm C4.5 process data from budget plan consultant planner cost to predict company profit. Data mining is a technique for extracting new information from piles or data warehouses, as we know information is seen as something that is very important and valuable because by mastering information it is easy to achieve a desired goal, this makes everyone race to while C4.5 algorithm is one of induction algorithm of decision tree that is ID3 (Iterative Dichotomiser 3). ID3 was developed by J. Ross Quinlan. In the ID3 algorithm procedure, the inputs are training samples, training labels and attributes. which will illustrate the profit prediction, the results of this study will result in the rules of profit and loss decisions company.
在建设项目活动中,计划作为工作执行者的参考,成为项目实施的标准,包括:文件、技术规范、进度和预算。不恰当的规划、不准确的项目实现调查、不充分的项目管理技能和缺乏专业的服务提供者,都与建设项目过程的结果密切相关。PT SMOE Indonesia是一家从事建筑咨询服务的公司。目前PT SMOE Indonesia已经完成了许多来自政府和私人的建筑规划项目,本研究将讨论如何使用算法C4.5处理预算计划顾问规划师成本数据来预测公司利润。数据挖掘是一种从成堆或数据仓库中提取新信息的技术,我们知道信息被视为非常重要和有价值的东西,因为掌握信息很容易实现预期的目标,这使得每个人都竞相使用,而C4.5算法是决策树的归纳算法之一,即ID3(迭代二分法3)。ID3是由J. Ross Quinlan开发的。在ID3算法过程中,输入是训练样本、训练标签和属性。这将说明利润预测,本研究的结果将导致公司的盈亏决策的规则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信