Enterprise-Wide Workflow Management

IEEE Concurr. Pub Date : 1999-07-01 DOI:10.1109/4434.788777
C. Bussler
{"title":"Enterprise-Wide Workflow Management","authors":"C. Bussler","doi":"10.1109/4434.788777","DOIUrl":null,"url":null,"abstract":"Establishing transparent workflow distribution across heterogeneous workflow-management systems is very difficult, if not impossible, to achieve. The author expands on this in a case study and suggests various approaches. The process for building a Boeing 747 serves as the case study.","PeriodicalId":282630,"journal":{"name":"IEEE Concurr.","volume":"101 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"55","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Concurr.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/4434.788777","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 55

Abstract

Establishing transparent workflow distribution across heterogeneous workflow-management systems is very difficult, if not impossible, to achieve. The author expands on this in a case study and suggests various approaches. The process for building a Boeing 747 serves as the case study.
企业级工作流管理
在异构工作流管理系统之间建立透明的工作流分布是非常困难的,如果不是不可能的话。作者在一个案例研究中对此进行了扩展,并提出了各种方法。制造波音747的过程可以作为案例研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信