Multistep Ahead Prediction of Electric Power Systems Using Multiple Gaussian Process Models

T. Hachino, H. Takata, S. Fukushima, Y. Igarashi, Keiji Naritomi
{"title":"Multistep Ahead Prediction of Electric Power Systems Using Multiple Gaussian Process Models","authors":"T. Hachino, H. Takata, S. Fukushima, Y. Igarashi, Keiji Naritomi","doi":"10.12720/joace.3.4.316-321","DOIUrl":null,"url":null,"abstract":"This paper focuses on the problem of multistep ahead prediction of electric power systems using the Gaussian process models. The Gaussian process model is a nonparametric model and the output of the model has Gaussian distribution with mean and variance. The multistep ahead prediction for the phase angle in transient state of the electric power system is accomplished by using multiple Gaussian process models as every step ahead predictors in accordance with the direct approach. The proposed prediction method gives the predictive values of the phase angle and the uncertainty of the predictive values as well. Simulation results for a simplified electric power system are shown to illustrate the effectiveness of the proposed prediction method.","PeriodicalId":239044,"journal":{"name":"Journal of Automation and Control Engineering","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Automation and Control Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12720/joace.3.4.316-321","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper focuses on the problem of multistep ahead prediction of electric power systems using the Gaussian process models. The Gaussian process model is a nonparametric model and the output of the model has Gaussian distribution with mean and variance. The multistep ahead prediction for the phase angle in transient state of the electric power system is accomplished by using multiple Gaussian process models as every step ahead predictors in accordance with the direct approach. The proposed prediction method gives the predictive values of the phase angle and the uncertainty of the predictive values as well. Simulation results for a simplified electric power system are shown to illustrate the effectiveness of the proposed prediction method.
基于多高斯过程模型的电力系统多步预测
本文研究了利用高斯过程模型对电力系统进行多步预测的问题。高斯过程模型是一种非参数模型,模型的输出具有均值和方差的高斯分布。根据直接法,采用多个高斯过程模型作为每一步超前预测器,实现了对电力系统暂态相角的多步超前预测。所提出的预测方法给出了相角的预测值和预测值的不确定性。通过一个简化电力系统的仿真结果,验证了所提预测方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书