Evaluasi Pelaksanaan Pembangunan Proyek Dengan Menggunakan Metode Earnede Value

Kiki Reski Meliya, Dewi Purnama sari, Muhammad Arrie Rafshanjani
{"title":"Evaluasi Pelaksanaan Pembangunan Proyek Dengan Menggunakan Metode Earnede Value","authors":"Kiki Reski Meliya, Dewi Purnama sari, Muhammad Arrie Rafshanjani","doi":"10.54543/etnik.v1i5.74","DOIUrl":null,"url":null,"abstract":"The Earned Value method is one of the tools used in project management which refers to cost and time. The existence of project indicators in terms of cost and time allows prevention so that the implementation of a project goes according to plan. Earned value method, it is necessary to evaluate at a time to determine the performance of a project. Housing for the poor which is carried out by the Aceh Barat district government aims for the convenience of the community, not all people are able to build comfortable and healthy homes because, for example, when their husband dies, their income is limited. This research examines the implementation of housing projects for the poor. The implementation of this project has been in accordance with the contract that has been scheduled with a completion time of 180 days (6 months). The population in this study is by measuring the cost and time in the implementation of the construction work of the Dhuafa Housing Rehabilitation, Johan Pahlwan District, West Aceh Regency. The method used in this research is a field study with the sample in this study using a survey of images taken when going down the field. This research aims to study and determine the performance in the implementation of the earned value method in project implementation using special allocation funds, and to determine whether the implementation is going according to the predetermined plan or not.","PeriodicalId":380922,"journal":{"name":"ETNIK: Jurnal Ekonomi dan Teknik","volume":"171 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ETNIK: Jurnal Ekonomi dan Teknik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54543/etnik.v1i5.74","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Earned Value method is one of the tools used in project management which refers to cost and time. The existence of project indicators in terms of cost and time allows prevention so that the implementation of a project goes according to plan. Earned value method, it is necessary to evaluate at a time to determine the performance of a project. Housing for the poor which is carried out by the Aceh Barat district government aims for the convenience of the community, not all people are able to build comfortable and healthy homes because, for example, when their husband dies, their income is limited. This research examines the implementation of housing projects for the poor. The implementation of this project has been in accordance with the contract that has been scheduled with a completion time of 180 days (6 months). The population in this study is by measuring the cost and time in the implementation of the construction work of the Dhuafa Housing Rehabilitation, Johan Pahlwan District, West Aceh Regency. The method used in this research is a field study with the sample in this study using a survey of images taken when going down the field. This research aims to study and determine the performance in the implementation of the earned value method in project implementation using special allocation funds, and to determine whether the implementation is going according to the predetermined plan or not.
使用Earnede Value方法评估项目实施情况
挣值法是指成本和时间的项目管理中使用的工具之一。成本和时间方面的项目指标的存在可以预防,从而使项目的实施按计划进行。在挣值法中,有必要一次评估一次,以确定一个项目的绩效。亚齐巴拉特区政府为穷人提供住房的目的是为社区提供便利,并非所有人都能够建造舒适和健康的住房,因为,例如,当他们的丈夫去世时,他们的收入受到限制。这项研究考察了穷人住房项目的实施情况。本项目已按合同约定实施,完成时间为180天(6个月)。在本研究中,人口是通过测量成本和时间在实施的建设工程的Dhuafa住房康复,Johan Pahlwan区,西亚齐县。本研究中使用的方法是实地研究,本研究中的样本使用实地调查时拍摄的图像。本研究旨在研究和确定挣值法在专项拨款项目实施中的实施效果,确定项目实施是否按照预定计划进行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信