Kajian Geometri Jalan Tambang untuk Meningkatkan Produksi Penambangan Andesit PT Gunung Kulalet Kecamatan Baleendah, Kabupaten Bandung, Provinsi Jawa Barat

Rijal Aditya Prasetya, Zaenal, N. F. Isniarno
{"title":"Kajian Geometri Jalan Tambang untuk Meningkatkan Produksi Penambangan Andesit PT Gunung Kulalet Kecamatan Baleendah, Kabupaten Bandung, Provinsi Jawa Barat","authors":"Rijal Aditya Prasetya, Zaenal, N. F. Isniarno","doi":"10.29313/bcsme.v2i2.3644","DOIUrl":null,"url":null,"abstract":"Abstract. This mining road evaluation activity is carried out with the aim of knowing the condition of the road geometry used as well as efforts to improve road geometry and production before repairing and after repairing the mining road including straight road width, bend road width, road slope, bend radius, superelevation, transverse slope, and the actual rimpull. This research was conducted using primary and secondary data collection methods, data processing techniques and data analysis techniques, which were compared with the standards in Decree No. 1827/K/30/MEM/2018 and AASHTO in an effort to increase mining production. Based on the results of the research, the actual width of the straight road is between 3,95 – 12,90 meters and the width of the bend road is 5,13 – 9,77 meters. For the road slope, the grade varies from 1,596% - 37,35% with a maximum standard grade of 12% so that there are 4 road segments that are repaired. The actual superelevation condition starts from 13,55% - 38,56% based on the calculation of the minimum superelevation is 6% so that repair simulations are carried out on each superelevation segment. Based on the results of calculations regarding production before repair of loading equipment of 81,61 BCM/hour and transportation equipment of 81,58 BCM/hour, with the company's production target of 100 BCM/hour. After simulating the improvement of road geometry, the production after repair of loading equipment was 105,91 BCM/hour and transportation equipment of 105,74 BCM/hour. The increase in production occurs because the circulation time of the conveyance is getting faster, where before the repair the cycle time is 13.03 minutes, while after the simulation the repair is 8.01 minutes. \nAbstrak. Kajian jalan tambang ini dilakukan dengan tujuan mengetahui produksi sebelum perbaikan geometri jalan tambang. Kemudian mengetahui upaya perbaikan geometri jalan tambang berdasarkan kesesuaian pada Kepmen No. 1827/K/30/MEM/2018 dan AASHTO dalam upaya mencapai target produksi. Tujuan selanjutnya mengetahui produksi dari alat muat dan alat angkut yang didapatkan setelah perbaikan geometri jalan tambang. Adapun geometri jalan tambang meliputi lebar jalan lurus, lebar jalan tikungan, kemiringan jalan, jari-jari tikungan, superelevasi, kemiringan melintang. Berdasarkan hasil penelitian kondisi lebar jalan lurus aktual berkisar antara 3,95 – 12,90 meter dan lebar jalan tikungan sebesar 5,13 – 9,77 meter. Kemiringan jalan memiliki grade bervariasi dimulai dari 1,596% - 37,35% dengan standar grade maksimal sebesar 12%. Kondisi superelevasi aktual dimulai dari 13,55% - 38,56% berdasarkan perhitungan superelevasi minimum adalah 6%, sehingga dilakukan simulasi perbaikan pada setiap segmen superelevasi. Berdasarkan hasil perhitungan mengenai produksi sebelum perbaikan alat muat sebesar 81,61 BCM/jam dan alat angkut sebesar 81,58 BCM/jam, dengan target produksi perusahaan sebesar 100 BCM/jam. Setelah dilakukan simulasi perbaikan geometri jalan didapatkan produksi alat muat sebesar 105,91 BCM/jam dan alat angkut sebesar 105,74 BCM/jam. Peningkatan produksi terjadi karena waktu edar dari alat angkut yang semakin cepat, dimana saat sebelum perbaikan waktu edarnya 13,03 menit, sedangkan setelah dilakukan simulasi perbaikan menjadi 8,01 menit.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"434 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v2i2.3644","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract. This mining road evaluation activity is carried out with the aim of knowing the condition of the road geometry used as well as efforts to improve road geometry and production before repairing and after repairing the mining road including straight road width, bend road width, road slope, bend radius, superelevation, transverse slope, and the actual rimpull. This research was conducted using primary and secondary data collection methods, data processing techniques and data analysis techniques, which were compared with the standards in Decree No. 1827/K/30/MEM/2018 and AASHTO in an effort to increase mining production. Based on the results of the research, the actual width of the straight road is between 3,95 – 12,90 meters and the width of the bend road is 5,13 – 9,77 meters. For the road slope, the grade varies from 1,596% - 37,35% with a maximum standard grade of 12% so that there are 4 road segments that are repaired. The actual superelevation condition starts from 13,55% - 38,56% based on the calculation of the minimum superelevation is 6% so that repair simulations are carried out on each superelevation segment. Based on the results of calculations regarding production before repair of loading equipment of 81,61 BCM/hour and transportation equipment of 81,58 BCM/hour, with the company's production target of 100 BCM/hour. After simulating the improvement of road geometry, the production after repair of loading equipment was 105,91 BCM/hour and transportation equipment of 105,74 BCM/hour. The increase in production occurs because the circulation time of the conveyance is getting faster, where before the repair the cycle time is 13.03 minutes, while after the simulation the repair is 8.01 minutes. Abstrak. Kajian jalan tambang ini dilakukan dengan tujuan mengetahui produksi sebelum perbaikan geometri jalan tambang. Kemudian mengetahui upaya perbaikan geometri jalan tambang berdasarkan kesesuaian pada Kepmen No. 1827/K/30/MEM/2018 dan AASHTO dalam upaya mencapai target produksi. Tujuan selanjutnya mengetahui produksi dari alat muat dan alat angkut yang didapatkan setelah perbaikan geometri jalan tambang. Adapun geometri jalan tambang meliputi lebar jalan lurus, lebar jalan tikungan, kemiringan jalan, jari-jari tikungan, superelevasi, kemiringan melintang. Berdasarkan hasil penelitian kondisi lebar jalan lurus aktual berkisar antara 3,95 – 12,90 meter dan lebar jalan tikungan sebesar 5,13 – 9,77 meter. Kemiringan jalan memiliki grade bervariasi dimulai dari 1,596% - 37,35% dengan standar grade maksimal sebesar 12%. Kondisi superelevasi aktual dimulai dari 13,55% - 38,56% berdasarkan perhitungan superelevasi minimum adalah 6%, sehingga dilakukan simulasi perbaikan pada setiap segmen superelevasi. Berdasarkan hasil perhitungan mengenai produksi sebelum perbaikan alat muat sebesar 81,61 BCM/jam dan alat angkut sebesar 81,58 BCM/jam, dengan target produksi perusahaan sebesar 100 BCM/jam. Setelah dilakukan simulasi perbaikan geometri jalan didapatkan produksi alat muat sebesar 105,91 BCM/jam dan alat angkut sebesar 105,74 BCM/jam. Peningkatan produksi terjadi karena waktu edar dari alat angkut yang semakin cepat, dimana saat sebelum perbaikan waktu edarnya 13,03 menit, sedangkan setelah dilakukan simulasi perbaikan menjadi 8,01 menit.
摘要。本次采矿道路评价活动的目的是了解所使用的道路几何形状的状况,以及在修复前和修复后改善道路几何形状和生产的努力,包括直线道路宽度、弯道宽度、道路坡度、弯道半径、超高标高、横向坡度和实际边缘拉力。本研究采用一手和二手数据收集方法、数据处理技术和数据分析技术,并与1827/K/30/MEM/2018号法令和AASHTO的标准进行比较,以提高采矿产量。根据研究结果,直道的实际宽度为3.95 ~ 12.90 m,弯道的实际宽度为5.13 ~ 9.77 m。对于道路坡度,坡度从1596 - 3735%不等,最高标准坡度为12%,因此有4段道路需要修复。在计算最小超标高为6%的基础上,实际超标高从13.55% ~ 38.56%开始,对每个超标高段进行修复模拟。根据装货设备维修前产量81,61 BCM/小时、运输设备维修前产量81,58 BCM/小时的计算结果,公司生产目标为100 BCM/小时。模拟改善道路几何形状后,装车设备修复后的产量为105,91 BCM/小时,运输设备修复后的产量为105,74 BCM/小时。产量的增加是由于输送系统的循环时间越来越快,其中修复前的周期时间为13.03分钟,而模拟后的修复时间为8.01分钟。Abstrak。吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安吉安Kemudian mengetahui upaya perbaikan geometri jalan tambang berdasarkan kesesaian padkepmen No. 1827/K/30/MEM/2018 dan AASHTO dalam upaya menapai目标产品。土语selanjutnya mengetahui produksi dari alat muat danalat angkut yang didapatkan setelah perbaikan geometri jalan tambang。Adapun geometri jalan tambang meliputi lebar jalan lurus, lebar jalan tikungan, kemiringan jalan, jari-jari tikungan, superelevasi, kemiringan melintang。Berdasarkan hasil penelitian kondisi lebar jalan lurus aktual berkisar antara 3,95 - 12,90米,但lebar jalan tikungan sebesar 5,13 - 9,77米。凯密林安贾兰姆米里基等级bervariasdimulai达1,596% - 37,35%登甘标准等级maksimal sebesar 12%。Kondisi superelevasi实际高度135,55 % - 38,56%,berdasarkan perhitungan superelevasi最小高度6%,sehinga dilakukan simulasi perbaikan padseap分段超级高度。Berdasarkan hasil perhitungan mengenai产品perbaikan alat muat sebesar 81,61 BCM/jam, alat angkut sebesar 81,58 BCM/jam, dengan目标产品perusahaan sebesar 100 BCM/jam。Setelah dilakukan simulasi perbaikan geometri jalan didapatkan producksi alat muat sebesar 105,91 BCM/jam和alat angkut sebesar 105,74 BCM/jam。Peningkatan produksi terjadi karena waktu edar dari alat angkut yang semakin cepat, dimana saat sebelum perbaikan waktu edarnya 13,03, sedangkan setelah dilakukan simulasi perbaikan menjadi 8,01。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信