Case study of unforeseen negative impacts of a TQM program

B. Moore
{"title":"Case study of unforeseen negative impacts of a TQM program","authors":"B. Moore","doi":"10.1109/IEMC.1994.379949","DOIUrl":null,"url":null,"abstract":"Presented is a case study of some of the adverse impacts of formalization of a total quality management (TQM) program in a medium sized business. A brief description of the company culture before and after implementation of the TQM program is provided. The informal quality processes and employee attitudes are characterized followed by a depiction of the TQM formalization efforts and its impacts: both positive and negative. Since the negative results outweighed the positive in this example, the company shall be referred to as Company Z.<<ETX>>","PeriodicalId":200747,"journal":{"name":"Proceedings of 1994 IEEE International Engineering Management Conference - IEMC '94","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-10-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 1994 IEEE International Engineering Management Conference - IEMC '94","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMC.1994.379949","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Presented is a case study of some of the adverse impacts of formalization of a total quality management (TQM) program in a medium sized business. A brief description of the company culture before and after implementation of the TQM program is provided. The informal quality processes and employee attitudes are characterized followed by a depiction of the TQM formalization efforts and its impacts: both positive and negative. Since the negative results outweighed the positive in this example, the company shall be referred to as Company Z.<>
全面质量管理计划不可预见的负面影响的案例研究
本文介绍了一个中型企业全面质量管理(TQM)计划形式化的一些不利影响的案例研究。简要介绍了实施TQM计划前后的公司文化。非正式质量过程和员工态度的特征,随后描述了TQM形式化的努力及其影响:积极的和消极的。由于在本例中,负面结果大于正面结果,因此将该公司称为z公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信