Task Ordering in Incentives Under Externalities

M. Agastya, P. Bag, Nona Pepito
{"title":"Task Ordering in Incentives Under Externalities","authors":"M. Agastya, P. Bag, Nona Pepito","doi":"10.2139/ssrn.2749529","DOIUrl":null,"url":null,"abstract":"In a two-task team project with observable task outcomes, optimal incentives prioritize tasks differently depending on task externalities. When the tasks are independent, Principal follows a decreasing order by placing more essential task first. A task is more essential if its failure compromises the overall project's chance of success from a task-specific cutoff level by a greater percentage. This definition has no systematic relations to the variance of task outcomes. In particular, a more risky task can be less essential or more essential. Under externalities, essentiality and impact jointly determine the optimal ordering. A task with much higher impact can be performed early even if it is less essential. Optimal task ordering thus raises subtle new issues and forms an integral part in team incentives. Our analysis provides some contrast with recent team incentives results.","PeriodicalId":372415,"journal":{"name":"ERN: Employee Motivation & Incentives (Topic)","volume":"155 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Employee Motivation & Incentives (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2749529","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

In a two-task team project with observable task outcomes, optimal incentives prioritize tasks differently depending on task externalities. When the tasks are independent, Principal follows a decreasing order by placing more essential task first. A task is more essential if its failure compromises the overall project's chance of success from a task-specific cutoff level by a greater percentage. This definition has no systematic relations to the variance of task outcomes. In particular, a more risky task can be less essential or more essential. Under externalities, essentiality and impact jointly determine the optimal ordering. A task with much higher impact can be performed early even if it is less essential. Optimal task ordering thus raises subtle new issues and forms an integral part in team incentives. Our analysis provides some contrast with recent team incentives results.
外部性激励下的任务排序
在具有可观察任务结果的双任务团队项目中,最优激励根据任务外部性对任务进行不同的优先级排序。当任务独立时,Principal遵循降序排列,将更重要的任务放在首位。如果一个任务的失败使整个项目在特定任务的截止水平上的成功几率降低了更大的百分比,那么这个任务就更重要了。这个定义与任务结果的方差没有系统的关系。特别是,高风险的任务可能不那么重要,也可能更重要。在外部性下,本质性和冲击共同决定了最优排序。影响更大的任务可以尽早执行,即使它不那么重要。因此,最优任务排序引发了微妙的新问题,并成为团队激励的重要组成部分。我们的分析与最近的团队激励结果形成了一些对比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信