Assessing the Use of Construction Plant and Equipment by Construction Companies in Awka Anambra State, Nigeria

Kingsley Tochukwu Oguaju, G. U. R. Ukochi
{"title":"Assessing the Use of Construction Plant and Equipment by Construction Companies in Awka Anambra State, Nigeria","authors":"Kingsley Tochukwu Oguaju, G. U. R. Ukochi","doi":"10.56201/ijgem.v9.no3.2023.pg8.15","DOIUrl":null,"url":null,"abstract":"The research assessed the Use of Construction Plant and equipment by construction Companies in Awka. The researcher used survey research method through questionnaires to collect data. The target population was construction companies in Awka metropolis from which a sample of eighty (80) was drawn. The relevant literature was reviewed for the study. The data collected were presented, analyzed and hypothesis tested. Among other things the results of the study revealed the following: That there is inadequate or under - utilization of plant for construction works in Awka metropolis and this has resulted in delays. That there is ignorance of the knowledge of hiring and owning criteria as well as factors to be considered before applying plant on jobs for better works and economy. The following recommendations were made: Firstly, construction companies should procure some plant to reduce the percentage of work done manually. Secondly, to be an economic proposition, large items of plant need to be continuously employed and not left idle for considerable period of time. Owners of mechanical plant must have sufficient work for the plant either through firm's owned contract or through public line business. Thirdly, advice of quantity surveyors should be sought when decisions are to be taken whether to hire or purchase plaint items for some specified work.","PeriodicalId":415878,"journal":{"name":"IIARD INTERNATIONAL JOURNAL OF GEOGRAPHY AND ENVIRONMENTAL MANAGEMENT","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IIARD INTERNATIONAL JOURNAL OF GEOGRAPHY AND ENVIRONMENTAL MANAGEMENT","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56201/ijgem.v9.no3.2023.pg8.15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The research assessed the Use of Construction Plant and equipment by construction Companies in Awka. The researcher used survey research method through questionnaires to collect data. The target population was construction companies in Awka metropolis from which a sample of eighty (80) was drawn. The relevant literature was reviewed for the study. The data collected were presented, analyzed and hypothesis tested. Among other things the results of the study revealed the following: That there is inadequate or under - utilization of plant for construction works in Awka metropolis and this has resulted in delays. That there is ignorance of the knowledge of hiring and owning criteria as well as factors to be considered before applying plant on jobs for better works and economy. The following recommendations were made: Firstly, construction companies should procure some plant to reduce the percentage of work done manually. Secondly, to be an economic proposition, large items of plant need to be continuously employed and not left idle for considerable period of time. Owners of mechanical plant must have sufficient work for the plant either through firm's owned contract or through public line business. Thirdly, advice of quantity surveyors should be sought when decisions are to be taken whether to hire or purchase plaint items for some specified work.
评估尼日利亚阿南布拉州建筑公司对建筑厂房和设备的使用情况
本研究评估了Awka建筑公司对建筑厂房和设备的使用情况。研究者采用调查研究的方法,通过问卷调查来收集数据。目标人群是Awka大都市的建筑公司,从中抽取了80个样本。本研究回顾了相关文献。收集到的数据进行了展示、分析和假设检验。除其他事项外,这项研究的结果显示如下:在Awka大都市区,建筑工程的厂房使用不足或利用不足,这造成了延误。对于雇佣和拥有标准的知识,以及为了更好的工作和经济而在申请工作之前要考虑的因素,都是无知的。提出以下建议:首先,建筑公司应该采购一些设备,以减少手工完成的工作比例。其次,作为一个经济命题,工厂的大型项目需要持续使用,而不是闲置相当长的一段时间。机械工厂的所有者必须通过公司自有合同或通过公共线路业务为工厂提供足够的工作。第三,在决定是否为某些特定的工作雇用或购买投诉项目时,应征求工料测量师的意见。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信