{"title":"Research on Decision-making of Main Manufacturer-supplier Participating in Complex Equipment Based on Time Coupling","authors":"Feng Chen, Yongbo Cheng","doi":"10.2991/ICOEME-19.2019.99","DOIUrl":null,"url":null,"abstract":"—Based on the process of information exchange and accumulation between the main manufacturer and the supplier, this paper puts forward the cumulative function of information exchange and knowledge. Based on Ohm's law in physics, Ohm's law of knowledge is put forward to construct knowledge potential, knowledge flow and knowledge transfer quantity to maximize the overall benefit. This paper also explores the intervention time of supplier's involvement in R&D of complex equipment, the frequency of information exchange between the two sides and provides reference for the development process of aviation complex equipment.","PeriodicalId":133507,"journal":{"name":"Proceedings of the 2nd International Conference on Economy, Management and Entrepreneurship (ICOEME 2019)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2nd International Conference on Economy, Management and Entrepreneurship (ICOEME 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/ICOEME-19.2019.99","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
—Based on the process of information exchange and accumulation between the main manufacturer and the supplier, this paper puts forward the cumulative function of information exchange and knowledge. Based on Ohm's law in physics, Ohm's law of knowledge is put forward to construct knowledge potential, knowledge flow and knowledge transfer quantity to maximize the overall benefit. This paper also explores the intervention time of supplier's involvement in R&D of complex equipment, the frequency of information exchange between the two sides and provides reference for the development process of aviation complex equipment.