Robert I. Davis, Abhilash Thekkilakattil, Oliver Gettings, R. Dobrin, S. Punnekkat
{"title":"Quantifying the Exact Sub-optimality of Non-preemptive Scheduling","authors":"Robert I. Davis, Abhilash Thekkilakattil, Oliver Gettings, R. Dobrin, S. Punnekkat","doi":"10.1109/RTSS.2015.17","DOIUrl":null,"url":null,"abstract":"Fixed priority scheduling is used in many real-time systems, however, both preemptive and non-preemptive variants (FP-P and FP-NP) are known to be sub-optimal when compared to an optimal uniprocessor scheduling algorithm such as preemptive Earliest Deadline First (EDF-P). In this paper, we investigate the sub-optimality of fixed priority non-preemptive scheduling. Specifically, we derive the exact processor speed-up factor required to guarantee the feasibility under FP-NP (i.e. schedulablability assuming an optimal priority assignment) of any task set that is feasible under EDF-P. As a consequence of this work, we also derive a lower bound on the sub-optimality of non-preemptive EDF (EDF-NP), which since it matches a recently published upper bound gives the exact sub-optimality for EDF-NP. It is known that neither preemptive, nor non-preemptive fixed priority scheduling dominates the other, i.e., there are task sets that are feasible on a processor of unit speed under FP-P that are not feasible under FP-NP and vice-versa. Hence comparing these two algorithms, there are non-trivial speedup factors in both directions. We derive the exact speed-up factor required to guarantee the FP-NP feasibility of any FP-P feasible task set. Further, we derive upper and lower bounds on the speed-up factor required to guarantee FP-P feasibility of any FP-NP feasible task set. Empirical evidence suggests that the lower bound may be tight, and hence equate to the exact speed-up factor in this case.","PeriodicalId":239882,"journal":{"name":"2015 IEEE Real-Time Systems Symposium","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Real-Time Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTSS.2015.17","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14
Abstract
Fixed priority scheduling is used in many real-time systems, however, both preemptive and non-preemptive variants (FP-P and FP-NP) are known to be sub-optimal when compared to an optimal uniprocessor scheduling algorithm such as preemptive Earliest Deadline First (EDF-P). In this paper, we investigate the sub-optimality of fixed priority non-preemptive scheduling. Specifically, we derive the exact processor speed-up factor required to guarantee the feasibility under FP-NP (i.e. schedulablability assuming an optimal priority assignment) of any task set that is feasible under EDF-P. As a consequence of this work, we also derive a lower bound on the sub-optimality of non-preemptive EDF (EDF-NP), which since it matches a recently published upper bound gives the exact sub-optimality for EDF-NP. It is known that neither preemptive, nor non-preemptive fixed priority scheduling dominates the other, i.e., there are task sets that are feasible on a processor of unit speed under FP-P that are not feasible under FP-NP and vice-versa. Hence comparing these two algorithms, there are non-trivial speedup factors in both directions. We derive the exact speed-up factor required to guarantee the FP-NP feasibility of any FP-P feasible task set. Further, we derive upper and lower bounds on the speed-up factor required to guarantee FP-P feasibility of any FP-NP feasible task set. Empirical evidence suggests that the lower bound may be tight, and hence equate to the exact speed-up factor in this case.